IAC logo
IAC Assessment: AS0255
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: AS0255
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Arizona State University
Assessment Year 1999
Principal Product Jet Engine Components
NAICS n/a
SIC 3724 - Aircraft Engines And Engine Parts
Sales $10,000,000-$50,000,000
# of Employees 310
Plant Area (Sq.Ft.) 100,000
Annual Production 22,800 Pieces
Production Hrs. Annual 4,800
Location (State) AZ
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $264,284 4,718,347 kWh $0.06
Electricity Demand $33,183 11,521 kW-months/year $2.88
Electricity Fees $22,782 - $ -
Natural Gas $52,021 8,070 MMBtu $6.45
TOTAL ENERGY COSTS $383,009
RECOMMENDED SAVINGS* $45,633 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $12,000
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Other Liquid (haz) Personnel Changes Administrative Changes Primary Raw Material Electricity Usage Electricity Demand Other Liquid (haz) Personnel Changes Administrative Changes Primary Raw Material
$ kWh $ kW-months/year $ gal $ $ $ $ $ $
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$10,341
Cost:
$20,474
$6,588 171,454 $3,753 354 - - - - - - - - $6,588
171,454
kWh
$3,753
354
kW-months/year
-
-
gal
-
-
$
-
-
$
-
-
$
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$358
Cost:
$442
$171 4,396 $48 4 - - $65 - - - $74 - $171
4,396
kWh
$48
4
kW-months/year
-
-
gal
$65
-
$
-
-
$
$74
-
$
03: 2.6211 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES Savings:
$1,365
Cost:
$195
$1,064 26,964 $301 27 - - - - - - - - $1,064
26,964
kWh
$301
27
kW-months/year
-
-
gal
-
-
$
-
-
$
-
-
$
04: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$2,392
Cost:
$120
$1,100 27,843 $1,292 115 - - - - - - - - $1,100
27,843
kWh
$1,292
115
kW-months/year
-
-
gal
-
-
$
-
-
$
-
-
$
05: 2.7232 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL Savings:
$10,137
Cost:
$14,500
$6,513 164,127 $3,624 324 - - - - - - - - $6,513
164,127
kWh
$3,624
324
kW-months/year
-
-
gal
-
-
$
-
-
$
-
-
$
06: 3.6192 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL Savings:
$5,779
Cost:
$120
- - - - $5,779 - - - - - - - -
-
kWh
-
-
kW-months/year
$5,779
-
gal
-
-
$
-
-
$
-
-
$
07: 4.821 PAY BILLS ON TIME TO AVOID LATE FEES Savings:
$3,261
Cost:
$60
- - - - - - - - $3,261 - - - -
-
kWh
-
-
kW-months/year
-
-
gal
-
-
$
$3,261
-
$
-
-
$
08: 4.513 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS Savings:
$12,000
Cost:
$1,500
- - - - - - $12,000 - - - - - -
-
kWh
-
-
kW-months/year
-
-
gal
$12,000
-
$
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$45,633
Cost:
$37,411
$15,436 394,784 $9,018 824 $5,779 - $12,065 - $3,261 - $74 - $15,436
394,784
kWh
$9,018
824
kW-months/year
$5,779
-
gal
$12,065
-
$
$3,261
-
$
$74
-
$
TOTAL IMPLEMENTED Savings:
$12,000
Cost:
$1,500
- - - - - - $12,000 - - - - - -
-
kWh
-
-
kW-months/year
-
-
gal
$12,000
-
$
-
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ gal $ $ $ $ $ $
Electricity Usage Electricity Demand Other Liquid (haz) Personnel Changes Administrative Changes Primary Raw Material Electricity Usage Electricity Demand Other Liquid (haz) Personnel Changes Administrative Changes Primary Raw Material