IAC logo
IAC Assessment: AS0257
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: AS0257
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Arizona State University
Assessment Year 1999
Principal Product Concrete
NAICS n/a
SIC 3272 - Concrete Products, Nec
Sales $1,000,000-$5,000,000
# of Employees 55
Plant Area (Sq.Ft.) 110,000
Annual Production 450,000 Tons
Production Hrs. Annual 5,450
Location (State) AZ
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $55,329 819,461 kWh $0.07
Electricity Demand $12,924 4,929 kW-months/year $2.62
Electricity Fees $4,916 - $ -
TOTAL ENERGY COSTS $73,169
RECOMMENDED SAVINGS* $207,672 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $206,647
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Other Liquid (non-haz) Personnel Changes Administrative Changes Ancillary Material Cost Electricity Usage Electricity Demand Other Liquid (non-haz) Personnel Changes Administrative Changes Ancillary Material Cost
$ kWh $ kW-months/year $ gal $ $ $ $ $ $
01: 2.7121 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT Savings:
$405
Cost:
$70
$405 5,569 - - - - - - - - - - $405
5,569
kWh
-
-
kW-months/year
-
-
gal
-
-
$
-
-
$
-
-
$
02: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$461
Cost:
$60
$399 5,569 $62 22 - - - - - - - - $399
5,569
kWh
$62
22
kW-months/year
-
-
gal
-
-
$
-
-
$
-
-
$
03: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$1,802
Cost:
$2,140
$1,657 22,860 $145 50 - - - - - - - - $1,657
22,860
kWh
$145
50
kW-months/year
-
-
gal
-
-
$
-
-
$
-
-
$
04: 2.4314 USE SYNTHETIC LUBRICANT Savings:
$148
Cost:
$360
$34 586 $3 1 $12 14 - - - - $99 - $34
586
kWh
$3
1
kW-months/year
$12
14
gal
-
-
$
-
-
$
$99
-
$
05: 4.821 PAY BILLS ON TIME TO AVOID LATE FEES Savings:
$728
Cost:
$60
- - - - - - - - $728 - - - -
-
kWh
-
-
kW-months/year
-
-
gal
-
-
$
$728
-
$
-
-
$
06: 4.445 INSTALL EQUIPMENT TO MOVE PRODUCT Savings:
$203,979
Cost:
$64,000
$(-12,893) (-177,315) $(-1,128) (-390) - - $218,000 - - - - - $(-12,893)
(-177,315)
kWh
$(-1,128)
(-390)
kW-months/year
-
-
gal
$218,000
-
$
-
-
$
-
-
$
07: 2.8114 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE Savings:
$149
Cost:
$15
- - - - - - - - $149 - - - -
-
kWh
-
-
kW-months/year
-
-
gal
-
-
$
$149
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$207,672
Cost:
$66,705
$(-10,398) (-142,731) $(-918) (-317) $12 14 $218,000 - $877 - $99 - $(-10,398)
(-142,731)
kWh
$(-918)
(-317)
kW-months/year
$12
14
gal
$218,000
-
$
$877
-
$
$99
-
$
TOTAL IMPLEMENTED Savings:
$206,647
Cost:
$66,270
$(-10,432) (-143,317) $(-921) (-318) - - $218,000 - - - - - $(-10,432)
(-143,317)
kWh
$(-921)
(-318)
kW-months/year
-
-
gal
$218,000
-
$
-
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ gal $ $ $ $ $ $
Electricity Usage Electricity Demand Other Liquid (non-haz) Personnel Changes Administrative Changes Ancillary Material Cost Electricity Usage Electricity Demand Other Liquid (non-haz) Personnel Changes Administrative Changes Ancillary Material Cost