IAC Assessment: AS0258
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Arizona State University
Assessment Year 1999
Principal Product Aircraft
NAICS n/a
SIC 3721 - Aircraft
Sales $50,000,000-$100,000,000
# of Employees 700
Plant Area (Sq.Ft.) 427,494
Annual Production 60 Pieces
Production Hrs. Annual 8,760
Location (State) AZ
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $682,434 10,408,851 kWh $0.07
Electricity Demand $169,209 23,966 kW-months/year $7.06
Electricity Fees $44,332 - $ -
Natural Gas $217,154 35,286 MMBtu $6.15
TOTAL ENERGY COSTS $1,163,261
RECOMMENDED SAVINGS* $521,563 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Other Liquid (non-haz) Personnel Changes Administrative Changes Ancillary Material Cost Electricity Usage Electricity Demand Other Liquid (non-haz) Personnel Changes Administrative Changes Ancillary Material Cost
$ kWh $ kW-months/year $ gal $ $ $ $ $ $
01: 2.7232 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL Savings:
$8,211
Cost:
$7,000
$6,863 102,872 $1,348 366 - - - - - - - - $6,863
102,872
kWh
$1,348
366
kW-months/year
-
-
gal
-
-
$
-
-
$
-
-
$
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,279
Cost:
$1,462
$756 11,430 $100 14 - - $214 - - - $209 - $756
11,430
kWh
$100
14
kW-months/year
-
-
gal
$214
-
$
-
-
$
$209
-
$
03: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$7,596
Cost:
$8,925
$6,450 96,717 $1,146 164 - - - - - - - - $6,450
96,717
kWh
$1,146
164
kW-months/year
-
-
gal
-
-
$
-
-
$
-
-
$
04: 2.4314 USE SYNTHETIC LUBRICANT Savings:
$2,076
Cost:
$2,889
$175 2,638 $67 10 $89 97 - - - - $1,745 - $175
2,638
kWh
$67
10
kW-months/year
$89
97
gal
-
-
$
-
-
$
$1,745
-
$
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$61,388
Cost:
$121,971
$50,867 763,189 $10,521 1,503 - - - - - - - - $50,867
763,189
kWh
$10,521
1,503
kW-months/year
-
-
gal
-
-
$
-
-
$
-
-
$
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$379
Cost:
$240
$305 4,689 $74 11 - - - - - - - - $305
4,689
kWh
$74
11
kW-months/year
-
-
gal
-
-
$
-
-
$
-
-
$
07: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS Savings:
$4,913
Cost:
$3,123
$4,041 60,668 $872 120 - - - - - - - - $4,041
60,668
kWh
$872
120
kW-months/year
-
-
gal
-
-
$
-
-
$
-
-
$
08: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$19,628
Cost:
$20,250
$15,278 229,191 $4,350 621 - - - - - - - - $15,278
229,191
kWh
$4,350
621
kW-months/year
-
-
gal
-
-
$
-
-
$
-
-
$
09: 2.7121 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT Savings:
$10,564
Cost:
$6,100
$10,564 158,558 - - - - - - - - - - $10,564
158,558
kWh
-
-
kW-months/year
-
-
gal
-
-
$
-
-
$
-
-
$
10: 2.7132 INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS Savings:
$49,340
Cost:
$21,154
$45,577 683,763 $3,763 2,689 - - - - - - - - $45,577
683,763
kWh
$3,763
2,689
kW-months/year
-
-
gal
-
-
$
-
-
$
-
-
$
11: 3.5111 FILTER AND REUSE HYDRAULIC OIL Savings:
$32,354
Cost:
$1,600
- - $(-35) (-5) - 10,250 $(-740) - - - $33,129 - -
-
kWh
$(-35)
(-5)
kW-months/year
-
10,250
gal
$(-740)
-
$
-
-
$
$33,129
-
$
12: 3.6192 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL Savings:
$2,235
Cost:
$30
- - - - - - - - $2,235 - - - -
-
kWh
-
-
kW-months/year
-
-
gal
-
-
$
$2,235
-
$
-
-
$
13: 4.514 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE HANDLING COSTS Savings:
$321,600
Cost:
$53,760
- - - - - - $321,600 - - - - - -
-
kWh
-
-
kW-months/year
-
-
gal
$321,600
-
$
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$521,563
Cost:
$248,504
$140,876 2,113,715 $22,206 5,493 $89 10,347 $321,074 - $2,235 - $35,083 - $140,876
2,113,715
kWh
$22,206
5,493
kW-months/year
$89
10,347
gal
$321,074
-
$
$2,235
-
$
$35,083
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
gal
-
-
$
-
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ gal $ $ $ $ $ $
Electricity Usage Electricity Demand Other Liquid (non-haz) Personnel Changes Administrative Changes Ancillary Material Cost Electricity Usage Electricity Demand Other Liquid (non-haz) Personnel Changes Administrative Changes Ancillary Material Cost