IAC logo
IAC Assessment: AS0260
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: AS0260
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Arizona State University
Assessment Year 1999
Principal Product Architectural Mill Work
NAICS n/a
SIC 2431 - Millwork
Sales $10,000,000-$50,000,000
# of Employees 110
Plant Area (Sq.Ft.) 73,000
Annual Production 150 Thousand Feet
Production Hrs. Annual 4,336
Location (State) AZ
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $52,044 619,578 kWh $0.08
Electricity Demand $3,588 2,120 kW-months/year $1.69
Electricity Fees $3,877 - $ -
Natural Gas $5,845 627 MMBtu $9.32
LPG $1,498 73 MMBtu $20.52
TOTAL ENERGY COSTS $71,149
RECOMMENDED SAVINGS* $29,240 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Administrative Changes Electricity Usage Electricity Demand Administrative Changes
$ kWh $ kW-months/year $ $
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$2,960
Cost:
$8,259
$2,401 31,360 $559 103 - - $2,401
31,360
kWh
$559
103
kW-months/year
-
-
$
02: 2.7133 USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE Savings:
$1,591
Cost:
$1,300
$1,591 20,809 - - - - $1,591
20,809
kWh
-
-
kW-months/year
-
-
$
03: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$9,200
Cost:
$7,600
$9,200 120,164 - - - - $9,200
120,164
kWh
-
-
kW-months/year
-
-
$
04: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$423
Cost:
$60
$355 4,689 $68 23 - - $355
4,689
kWh
$68
23
kW-months/year
-
-
$
05: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$6,157
Cost:
$240
$5,168 67,702 $989 183 - - $5,168
67,702
kWh
$989
183
kW-months/year
-
-
$
06: 3.5316 CONTRACT A WOOD PALLET RECYCLING COMPANY Savings:
$4,639
Cost:
$1,060
- - - - $4,639 - -
-
kWh
-
-
kW-months/year
$4,639
-
$
07: 3.6192 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL Savings:
$3,300
Cost:
$30
- - - - $3,300 - -
-
kWh
-
-
kW-months/year
$3,300
-
$
08: 4.111 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK Savings:
$970
Cost:
-
- - $970 179 - - -
-
kWh
$970
179
kW-months/year
-
-
$
TOTAL RECOMMENDED Savings:
$29,240
Cost:
$18,549
$18,715 244,724 $2,586 488 $7,939 - $18,715
244,724
kWh
$2,586
488
kW-months/year
$7,939
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - -
-
kWh
-
-
kW-months/year
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ $
Electricity Usage Electricity Demand Administrative Changes Electricity Usage Electricity Demand Administrative Changes