IAC Assessment: AS0262
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: AS0262
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Arizona State University
Assessment Year 1999
Principal Product Pre-cast Concrete
NAICS n/a
SIC 3272 - Concrete Products, Nec
Sales $10,000,000-$50,000,000
# of Employees 80
Plant Area (Sq.Ft.) 56,000
Annual Production 30,000 Tons
Production Hrs. Annual 3,850
Location (State) AZ
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $51,470 582,063 kWh $0.09
Electricity Demand $4,815 2,809 kW-months/year $1.71
Electricity Fees $4,945 - $ -
Natural Gas $12,693 1,778 MMBtu $7.14
TOTAL ENERGY COSTS $79,110
RECOMMENDED SAVINGS* $209,923 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $11,917
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Other Liquid (non-haz) Personnel Changes Administrative Changes Ancillary Material Cost Water Consumption Primary Product Electricity Usage Electricity Demand Other Liquid (non-haz) Personnel Changes Administrative Changes Ancillary Material Cost Water Consumption Primary Product
$ kWh $ kW-months/year $ gal $ $ $ $ $ $ $ Tgal $ $
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,565
Cost:
$3,139
$1,210 15,533 $355 65 - - - - - - - - - - - - $1,210
15,533
kWh
$355
65
kW-months/year
-
-
gal
-
-
$
-
-
$
-
-
$
-
-
Tgal
-
-
$
02: 2.7121 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT Savings:
$4,369
Cost:
$1,700
$4,369 56,272 - - - - - - - - - - - - - - $4,369
56,272
kWh
-
-
kW-months/year
-
-
gal
-
-
$
-
-
$
-
-
$
-
-
Tgal
-
-
$
03: 2.4314 USE SYNTHETIC LUBRICANT Savings:
$1,269
Cost:
$2,378
$240 3,224 $53 10 $110 121 - - - - $866 - - - - - $240
3,224
kWh
$53
10
kW-months/year
$110
121
gal
-
-
$
-
-
$
$866
-
$
-
-
Tgal
-
-
$
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$7,548
Cost:
$100
$6,185 79,426 $1,363 248 - - - - - - - - - - - - $6,185
79,426
kWh
$1,363
248
kW-months/year
-
-
gal
-
-
$
-
-
$
-
-
$
-
-
Tgal
-
-
$
05: 3.6192 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL Savings:
$3,402
Cost:
$120
- - - - - - - - $3,402 - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
gal
-
-
$
$3,402
-
$
-
-
$
-
-
Tgal
-
-
$
06: 3.4155 METER WASTE WATER Savings:
$2,057
Cost:
$5,000
- - - - - - - - - - - - $2,057 - - - -
-
kWh
-
-
kW-months/year
-
-
gal
-
-
$
-
-
$
-
-
$
$2,057
-
Tgal
-
-
$
07: 4.111 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK Savings:
$178,632
Cost:
$50,000
- - - - - - $(-21,368) - - - - - - - $200,000 - -
-
kWh
-
-
kW-months/year
-
-
gal
$(-21,368)
-
$
-
-
$
-
-
$
-
-
Tgal
$200,000
-
$
08: 4.111 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK Savings:
$11,081
Cost:
$25,000
$(-4,606) (-59,203) $(-6,513) (-1,184) - - $22,200 - - - - - - - - - $(-4,606)
(-59,203)
kWh
$(-6,513)
(-1,184)
kW-months/year
-
-
gal
$22,200
-
$
-
-
$
-
-
$
-
-
Tgal
-
-
$
TOTAL RECOMMENDED Savings:
$209,923
Cost:
$87,437
$7,398 95,252 $(-4,742) (-861) $110 121 $832 - $3,402 - $866 - $2,057 - $200,000 - $7,398
95,252
kWh
$(-4,742)
(-861)
kW-months/year
$110
121
gal
$832
-
$
$3,402
-
$
$866
-
$
$2,057
-
Tgal
$200,000
-
$
TOTAL IMPLEMENTED Savings:
$11,917
Cost:
$1,800
$10,554 135,698 $1,363 248 - - - - - - - - - - - - $10,554
135,698
kWh
$1,363
248
kW-months/year
-
-
gal
-
-
$
-
-
$
-
-
$
-
-
Tgal
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ gal $ $ $ $ $ $ $ Tgal $ $
Electricity Usage Electricity Demand Other Liquid (non-haz) Personnel Changes Administrative Changes Ancillary Material Cost Water Consumption Primary Product Electricity Usage Electricity Demand Other Liquid (non-haz) Personnel Changes Administrative Changes Ancillary Material Cost Water Consumption Primary Product