Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Arizona State University |
---|---|
Assessment Year | 1999 |
Principal Product | Paper Products |
NAICS | n/a |
SIC | 2679 - Converted Paper Products, Nec |
Sales | $5,000,000-$10,000,000 |
# of Employees | 40 |
Plant Area (Sq.Ft.) | 90,000 |
Annual Production | 9,000 Thousand Feet |
Production Hrs. Annual | 2,375 |
Location (State) | AZ |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $31,658 | 492,966 | kWh | $0.06 |
Electricity Demand | $4,641 | 1,777 | kW-months/year | $2.61 |
Electricity Fees | $3,097 | - | $ | - |
TOTAL ENERGY COSTS | $41,193 | |||
RECOMMENDED SAVINGS* | $140,061 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | - |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Solid Waste (non-haz) | Personnel Changes | Administrative Changes | Increase in Production | Electricity Usage | Electricity Demand | Solid Waste (non-haz) | Personnel Changes | Administrative Changes | Increase in Production | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | lb | $ | $ | $ | $ | $ | % | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $1,077 Cost: $3,520 |
$757 | 13,482 | $320 | 55 | - | - | - | - | - | - | - | - |
$757 13,482 kWh |
$320 55 kW-months/year |
- - lb |
- - $ |
- - $ |
- - % |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.7121 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT |
Savings: $2,413 Cost: $5,527 |
$2,413 | 42,790 | - | - | - | - | - | - | - | - | - | - |
$2,413 42,790 kWh |
- - kW-months/year |
- - lb |
- - $ |
- - $ |
- - % |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $318 Cost: $60 |
$88 | 1,465 | $230 | 39 | - | - | - | - | - | - | - | - |
$88 1,465 kWh |
$230 39 kW-months/year |
- - lb |
- - $ |
- - $ |
- - % |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS |
Savings: $540 Cost: $750 |
$540 | 9,672 | - | - | - | - | - | - | - | - | - | - |
$540 9,672 kWh |
- - kW-months/year |
- - lb |
- - $ |
- - $ |
- - % |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 3.5217 REUSE / RECYCLE/ SELL PAPER PRODUCTS |
Savings: $1,073 Cost: $120 |
- | - | - | - | $(-802) | - | $1,875 | - | - | - | - | - |
- - kWh |
- - kW-months/year |
$(-802) - lb |
$1,875 - $ |
- - $ |
- - % |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 4.821 PAY BILLS ON TIME TO AVOID LATE FEES |
Savings: $390 Cost: $60 |
- | - | - | - | - | - | - | - | $390 | - | - | - |
- - kWh |
- - kW-months/year |
- - lb |
- - $ |
$390 - $ |
- - % |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 4.112 REPLACE OLD MACHINE WITH NEW AUTOMATIC MULTI-STATION TOOL |
Savings: $63,000 Cost: $67,220 |
- | - | - | - | - | - | - | - | - | - | $63,000 | - |
- - kWh |
- - kW-months/year |
- - lb |
- - $ |
- - $ |
$63,000 - % |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 4.513 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS |
Savings: $71,250 Cost: $300 |
- | - | - | - | - | - | $71,250 | - | - | - | - | - |
- - kWh |
- - kW-months/year |
- - lb |
$71,250 - $ |
- - $ |
- - % |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $140,061 Cost: $77,557 |
$3,798 | 67,409 | $550 | 94 | $(-802) | - | $73,125 | - | $390 | - | $63,000 | - | $3,798 67,409 kWh |
$550 94 kW-months/year |
$(-802) - lb |
$73,125 - $ |
$390 - $ |
$63,000 - % |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: - Cost: - |
- | - | - | - | - | - | - | - | - | - | - | - | - - kWh |
- - kW-months/year |
- - lb |
- - $ |
- - $ |
- - % |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | lb | $ | $ | $ | $ | $ | % | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Solid Waste (non-haz) | Personnel Changes | Administrative Changes | Increase in Production | Electricity Usage | Electricity Demand | Solid Waste (non-haz) | Personnel Changes | Administrative Changes | Increase in Production |