IAC Assessment: AS0264
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: AS0264
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Arizona State University
Assessment Year 1999
Principal Product Paper Products
NAICS n/a
SIC 2679 - Converted Paper Products, Nec
Sales $5,000,000-$10,000,000
# of Employees 40
Plant Area (Sq.Ft.) 90,000
Annual Production 9,000 Thousand Feet
Production Hrs. Annual 2,375
Location (State) AZ
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $31,658 492,966 kWh $0.06
Electricity Demand $4,641 1,777 kW-months/year $2.61
Electricity Fees $3,097 - $ -
TOTAL ENERGY COSTS $41,193
RECOMMENDED SAVINGS* $140,061 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Solid Waste (non-haz) Personnel Changes Administrative Changes Increase in Production Electricity Usage Electricity Demand Solid Waste (non-haz) Personnel Changes Administrative Changes Increase in Production
$ kWh $ kW-months/year $ lb $ $ $ $ $ %
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,077
Cost:
$3,520
$757 13,482 $320 55 - - - - - - - - $757
13,482
kWh
$320
55
kW-months/year
-
-
lb
-
-
$
-
-
$
-
-
%
02: 2.7121 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT Savings:
$2,413
Cost:
$5,527
$2,413 42,790 - - - - - - - - - - $2,413
42,790
kWh
-
-
kW-months/year
-
-
lb
-
-
$
-
-
$
-
-
%
03: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$318
Cost:
$60
$88 1,465 $230 39 - - - - - - - - $88
1,465
kWh
$230
39
kW-months/year
-
-
lb
-
-
$
-
-
$
-
-
%
04: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$540
Cost:
$750
$540 9,672 - - - - - - - - - - $540
9,672
kWh
-
-
kW-months/year
-
-
lb
-
-
$
-
-
$
-
-
%
05: 3.5217 REUSE / RECYCLE/ SELL PAPER PRODUCTS Savings:
$1,073
Cost:
$120
- - - - $(-802) - $1,875 - - - - - -
-
kWh
-
-
kW-months/year
$(-802)
-
lb
$1,875
-
$
-
-
$
-
-
%
06: 4.8210 PAY BILLS ON TIME TO AVOID LATE FEES Savings:
$390
Cost:
$60
- - - - - - - - $390 - - - -
-
kWh
-
-
kW-months/year
-
-
lb
-
-
$
$390
-
$
-
-
%
07: 4.1120 REPLACE OLD MACHINE WITH NEW AUTOMATIC MULTI-STATION TOOL Savings:
$63,000
Cost:
$67,220
- - - - - - - - - - $63,000 - -
-
kWh
-
-
kW-months/year
-
-
lb
-
-
$
-
-
$
$63,000
-
%
08: 4.5130 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS Savings:
$71,250
Cost:
$300
- - - - - - $71,250 - - - - - -
-
kWh
-
-
kW-months/year
-
-
lb
$71,250
-
$
-
-
$
-
-
%
TOTAL RECOMMENDED Savings:
$140,061
Cost:
$77,557
$3,798 67,409 $550 94 $(-802) - $73,125 - $390 - $63,000 - $3,798
67,409
kWh
$550
94
kW-months/year
$(-802)
-
lb
$73,125
-
$
$390
-
$
$63,000
-
%
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
lb
-
-
$
-
-
$
-
-
%
Savings
Cost
$ kWh $ kW-months/year $ lb $ $ $ $ $ %
Electricity Usage Electricity Demand Solid Waste (non-haz) Personnel Changes Administrative Changes Increase in Production Electricity Usage Electricity Demand Solid Waste (non-haz) Personnel Changes Administrative Changes Increase in Production