IAC Assessment: AS0271
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: AS0271
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Arizona State University
Assessment Year 2000
Principal Product Evaporative Coolers
NAICS n/a
SIC 3585 - Refrigeration And Heating Equipment
Sales $10,000,000-$50,000,000
# of Employees 125
Plant Area (Sq.Ft.) 200,000
Annual Production 65,000 Pieces
Production Hrs. Annual 2,100
Location (State) AZ
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $128,285 2,002,638 kWh $0.06
Electricity Demand $22,664 8,482 kW-months/year $2.67
Electricity Fees $12,995 - $ -
Natural Gas $111,937 17,238 MMBtu $6.49
TOTAL ENERGY COSTS $297,443
RECOMMENDED SAVINGS* $30,005 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $16,872
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Personnel Changes Administrative Changes Ancillary Material Cost By-product Production Electricity Usage Electricity Demand Personnel Changes Administrative Changes Ancillary Material Cost By-product Production
$ kWh $ kW-months/year $ $ $ $ $ $ $ $
01: 2.7133 USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE Savings:
$1,637
Cost:
$1,266
$1,637 29,015 - - - - - - - - - - $1,637
29,015
kWh
-
-
kW-months/year
-
-
$
-
-
$
-
-
$
-
-
$
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$708
Cost:
$607
$433 7,620 $53 9 $122 - - - $100 - - - $433
7,620
kWh
$53
9
kW-months/year
$122
-
$
-
-
$
$100
-
$
-
-
$
03: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$591
Cost:
$600
$591 10,551 - - - - - - - - - - $591
10,551
kWh
-
-
kW-months/year
-
-
$
-
-
$
-
-
$
-
-
$
04: 2.4226 USE / PURCHASE OPTIMUM SIZED COMPRESSOR Savings:
$10,502
Cost:
$30,380
$6,594 116,940 $3,908 668 - - - - - - - - $6,594
116,940
kWh
$3,908
668
kW-months/year
-
-
$
-
-
$
-
-
$
-
-
$
05: 2.6125 KEEP EQUIPMENT CLEAN Savings:
$3,601
Cost:
$232
$2,261 40,152 $1,340 229 - - - - - - - - $2,261
40,152
kWh
$1,340
229
kW-months/year
-
-
$
-
-
$
-
-
$
-
-
$
06: 3.6192 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL Savings:
$795
Cost:
$120
- - - - - - $795 - - - - - -
-
kWh
-
-
kW-months/year
-
-
$
$795
-
$
-
-
$
-
-
$
07: 3.6192 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL Savings:
$403
Cost:
$60
- - - - - - $403 - - - - - -
-
kWh
-
-
kW-months/year
-
-
$
$403
-
$
-
-
$
-
-
$
08: 4.812 APPLY FOR INVESTMENT INCENTIVES Savings:
$1,640
Cost:
$60
- - - - - - $1,640 - - - - - -
-
kWh
-
-
kW-months/year
-
-
$
$1,640
-
$
-
-
$
-
-
$
09: 3.5316 CONTRACT A WOOD PALLET RECYCLING COMPANY Savings:
$10,128
Cost:
$120
- - - - - - - - - - $10,128 - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
$
-
-
$
$10,128
-
$
TOTAL RECOMMENDED Savings:
$30,005
Cost:
$33,445
$11,516 204,278 $5,301 906 $122 - $2,838 - $100 - $10,128 - $11,516
204,278
kWh
$5,301
906
kW-months/year
$122
-
$
$2,838
-
$
$100
-
$
$10,128
-
$
TOTAL IMPLEMENTED Savings:
$16,872
Cost:
$1,139
$2,694 47,772 $1,393 238 $122 - $2,435 - $100 - $10,128 - $2,694
47,772
kWh
$1,393
238
kW-months/year
$122
-
$
$2,435
-
$
$100
-
$
$10,128
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ $ $ $ $ $
Electricity Usage Electricity Demand Personnel Changes Administrative Changes Ancillary Material Cost By-product Production Electricity Usage Electricity Demand Personnel Changes Administrative Changes Ancillary Material Cost By-product Production