Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Arizona State University |
---|---|
Assessment Year | 2000 |
Principal Product | Coils |
NAICS | n/a |
SIC | 3498 - Fabricated Pipe And Fittings |
Sales | $5,000,000-$10,000,000 |
# of Employees | 50 |
Plant Area (Sq.Ft.) | 24,000 |
Annual Production | 35,000 Pieces |
Production Hrs. Annual | 5,225 |
Location (State) | AZ |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $45,093 | 544,842 | kWh | $0.08 |
Electricity Demand | $2,853 | 1,753 | kW-months/year | $1.63 |
Electricity Fees | $3,246 | - | $ | - |
Natural Gas | $27,167 | 4,061 | MMBtu | $6.69 |
TOTAL ENERGY COSTS | $96,105 | |||
RECOMMENDED SAVINGS* | $7,754 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $4,043 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Water Disposal | Solid Waste (non-haz) | Electricity Usage | Electricity Demand | Water Disposal | Solid Waste (non-haz) | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | Tgal | $ | lb | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $3,451 Cost: $5,643 |
$2,894 | 38,394 | $557 | 105 | - | - | - | - |
$2,894 38,394 kWh |
$557 105 kW-months/year |
- - Tgal |
- - lb |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.7133 USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE |
Savings: $260 Cost: $120 |
$260 | 3,517 | - | - | - | - | - | - |
$260 3,517 kWh |
- - kW-months/year |
- - Tgal |
- - lb |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $2,407 Cost: $120 |
$2,071 | 27,550 | $336 | 63 | - | - | - | - |
$2,071 27,550 kWh |
$336 63 kW-months/year |
- - Tgal |
- - lb |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 3.6192 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL |
Savings: $666 Cost: $60 |
- | - | - | - | - | - | $666 | - |
- - kWh |
- - kW-months/year |
- - Tgal |
$666 - lb |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 3.4156 USE FLOW CONTROL VALVES ON EQUIPMENT TO OPTIMIZE WATER USE |
Savings: $970 Cost: $60 |
- | - | - | - | $970 | 459,800 | - | - |
- - kWh |
- - kW-months/year |
$970 459,800 Tgal |
- - lb |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $7,754 Cost: $6,003 |
$5,225 | 69,461 | $893 | 168 | $970 | 459,800 | $666 | - | $5,225 69,461 kWh |
$893 168 kW-months/year |
$970 459,800 Tgal |
$666 - lb |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $4,043 Cost: $240 |
$2,071 | 27,550 | $336 | 63 | $970 | 459,800 | $666 | - | $2,071 27,550 kWh |
$336 63 kW-months/year |
$970 459,800 Tgal |
$666 - lb |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | Tgal | $ | lb | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Water Disposal | Solid Waste (non-haz) | Electricity Usage | Electricity Demand | Water Disposal | Solid Waste (non-haz) |