IAC logo
IAC Assessment: AS0284
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: AS0284
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Arizona State University
Assessment Year 2000
Principal Product Wood and Laminated Office and Store Fixtures
NAICS n/a
SIC 2431 - Millwork
Sales $5,000,000-$10,000,000
# of Employees 86
Plant Area (Sq.Ft.) 91,000
Annual Production 2,500,000 Pounds
Production Hrs. Annual 2,431
Location (State) AZ
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $58,471 943,728 kWh $0.06
Electricity Demand $9,409 3,606 kW-months/year $2.61
Electricity Fees $6,280 - $ -
TOTAL ENERGY COSTS $74,160
RECOMMENDED SAVINGS* $30,928 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $17,320
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Solid Waste (non-haz) Personnel Changes Administrative Changes Electricity Usage Electricity Demand Solid Waste (non-haz) Personnel Changes Administrative Changes
$ kWh $ kW-months/year $ lb $ $ $ $
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,064
Cost:
$2,486
$719 12,896 $345 59 - - - - - - $719
12,896
kWh
$345
59
kW-months/year
-
-
lb
-
-
$
-
-
$
02: 2.7121 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT Savings:
$1,003
Cost:
$800
$1,003 17,878 - - - - - - - - $1,003
17,878
kWh
-
-
kW-months/year
-
-
lb
-
-
$
-
-
$
03: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$10,564
Cost:
$3,800
$6,987 123,974 $3,577 612 - - - - - - $6,987
123,974
kWh
$3,577
612
kW-months/year
-
-
lb
-
-
$
-
-
$
04: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$1,270
Cost:
$60
$1,270 22,567 - - - - - - - - $1,270
22,567
kWh
-
-
kW-months/year
-
-
lb
-
-
$
-
-
$
05: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$809
Cost:
$100
$535 9,379 $274 47 - - - - - - $535
9,379
kWh
$274
47
kW-months/year
-
-
lb
-
-
$
-
-
$
06: 3.6192 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL Savings:
$852
Cost:
$60
- - - - - - - - $852 - -
-
kWh
-
-
kW-months/year
-
-
lb
-
-
$
$852
-
$
07: 3.5217 REUSE / RECYCLE/ SELL PAPER PRODUCTS Savings:
$315
Cost:
$60
- - - - $315 - - - - - -
-
kWh
-
-
kW-months/year
$315
-
lb
-
-
$
-
-
$
08: 4.8210 PAY BILLS ON TIME TO AVOID LATE FEES Savings:
$771
Cost:
$60
- - - - - - - - $771 - -
-
kWh
-
-
kW-months/year
-
-
lb
-
-
$
$771
-
$
09: 4.4320 CROSS-TRAIN PERSONNEL TO AVOID LOST TIME Savings:
$14,280
Cost:
$2,240
- - - - - - $14,280 - - - -
-
kWh
-
-
kW-months/year
-
-
lb
$14,280
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$30,928
Cost:
$9,666
$10,514 186,694 $4,196 718 $315 - $14,280 - $1,623 - $10,514
186,694
kWh
$4,196
718
kW-months/year
$315
-
lb
$14,280
-
$
$1,623
-
$
TOTAL IMPLEMENTED Savings:
$17,320
Cost:
$4,946
$1,254 22,275 $619 106 $315 - $14,280 - $852 - $1,254
22,275
kWh
$619
106
kW-months/year
$315
-
lb
$14,280
-
$
$852
-
$
Savings
Cost
$ kWh $ kW-months/year $ lb $ $ $ $
Electricity Usage Electricity Demand Solid Waste (non-haz) Personnel Changes Administrative Changes Electricity Usage Electricity Demand Solid Waste (non-haz) Personnel Changes Administrative Changes