Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Arizona State University |
---|---|
Assessment Year | 2001 |
Principal Product | Computer Circuit Boards |
NAICS | n/a |
SIC | 3679 - Electronic Components, Nec |
Sales | $10,000,000-$50,000,000 |
# of Employees | 63 |
Plant Area (Sq.Ft.) | 25,000 |
Annual Production | 4,000 Tons |
Production Hrs. Annual | 2,125 |
Location (State) | AZ |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $59,120 | 715,440 | kWh | $0.08 |
Electricity Demand | $4,532 | 2,702 | kW-months/year | $1.68 |
Electricity Fees | $4,429 | - | $ | - |
TOTAL ENERGY COSTS | $69,137 | |||
RECOMMENDED SAVINGS* | $241,105 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $234,131 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Other Liquid (non-haz) | Personnel Changes | Electricity Usage | Electricity Demand | Other Liquid (non-haz) | Personnel Changes | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | gal | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $1,104 Cost: $5,107 |
$856 | 11,384 | $248 | 47 | - | - | - | - |
$856 11,384 kWh |
$248 47 kW-months/year |
- - gal |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.7232 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL |
Savings: $4,459 Cost: $10,800 |
$3,948 | 52,502 | $511 | 96 | - | - | - | - |
$3,948 52,502 kWh |
$511 96 kW-months/year |
- - gal |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.7135 INSTALL OCCUPANCY SENSORS |
Savings: $433 Cost: $450 |
$386 | 5,136 | $47 | 105 | - | - | - | - |
$386 5,136 kWh |
$47 105 kW-months/year |
- - gal |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.4314 USE SYNTHETIC LUBRICANT |
Savings: $826 Cost: $694 |
$280 | 3,717 | $53 | 10 | $493 | 12 | - | - |
$280 3,717 kWh |
$53 10 kW-months/year |
$493 12 gal |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $152 Cost: $60 |
$128 | 1,702 | $24 | 5 | - | - | - | - |
$128 1,702 kWh |
$24 5 kW-months/year |
- - gal |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 4.431 TRAIN OPERATORS FOR MAXIMUM OPERATING EFFICIENCY |
Savings: $234,131 Cost: $140,869 |
- | - | - | - | - | - | $234,131 | - |
- - kWh |
- - kW-months/year |
- - gal |
$234,131 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $241,105 Cost: $157,980 |
$5,598 | 74,441 | $883 | 263 | $493 | 12 | $234,131 | - | $5,598 74,441 kWh |
$883 263 kW-months/year |
$493 12 gal |
$234,131 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $234,131 Cost: $140,869 |
- | - | - | - | - | - | $234,131 | - | - - kWh |
- - kW-months/year |
- - gal |
$234,131 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | gal | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Other Liquid (non-haz) | Personnel Changes | Electricity Usage | Electricity Demand | Other Liquid (non-haz) | Personnel Changes |