IAC logo
IAC Assessment: AS0297
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: AS0297
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Arizona State University
Assessment Year 2001
Principal Product Aluminum die casting
NAICS n/a
SIC 3363 - Aluminum Die-castings
Sales $5,000,000-$10,000,000
# of Employees 87
Plant Area (Sq.Ft.) 0
Annual Production 0 Units
Production Hrs. Annual 6,000
Location (State) AZ
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $132,244 2,105,600 kWh $0.06
Electricity Demand $34,676 4,661 kW-months/year $7.44
Electricity Fees $15,473 - $ -
Natural Gas $159,958 27,248 MMBtu $5.87
TOTAL ENERGY COSTS $352,049
RECOMMENDED SAVINGS* $203,696 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Personnel Changes By-product Production Electricity Usage Electricity Demand Natural Gas Personnel Changes By-product Production
$ kWh $ kW-months/year $ MMBtu $ $ $ $
01: 2.3415 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT Savings:
$166,920
Cost:
$35,000
$132,244 2,105,600 $34,676 4,661 - - - - - - $132,244
2,105,600
kWh
$34,676
4,661
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
02: 2.7145 INSTALL SKYLIGHTS Savings:
$1,527
Cost:
$3,086
$1,527 32,498 - - - - - - - - $1,527
32,498
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
03: 2.7133 USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE Savings:
$520
Cost:
$240
$520 7,656 - - - - - - - - $520
7,656
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
04: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT Savings:
$25,657
Cost:
$90,000
- - - - $25,657 4,925 - - - - -
-
kWh
-
-
kW-months/year
$25,657
4,925
MMBtu
-
-
$
-
-
$
05: 3.5316 CONTRACT A WOOD PALLET RECYCLING COMPANY Savings:
$3,360
Cost:
$60
- - - - - - - - $3,360 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
$3,360
-
$
06: 4.4310 TRAIN OPERATORS FOR MAXIMUM OPERATING EFFICIENCY Savings:
$5,712
Cost:
$5,916
- - - - - - $5,712 - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$5,712
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$203,696
Cost:
$134,302
$134,291 2,145,754 $34,676 4,661 $25,657 4,925 $5,712 - $3,360 - $134,291
2,145,754
kWh
$34,676
4,661
kW-months/year
$25,657
4,925
MMBtu
$5,712
-
$
$3,360
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $
Electricity Usage Electricity Demand Natural Gas Personnel Changes By-product Production Electricity Usage Electricity Demand Natural Gas Personnel Changes By-product Production