IAC logo
IAC Assessment: AS0301
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: AS0301
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Arizona State University
Assessment Year 2001
Principal Product Industrial and automotive spray booths
NAICS n/a
SIC 3444 - Sheet Metalwork
Sales $5,000,000-$10,000,000
# of Employees 34
Plant Area (Sq.Ft.) 12,000
Annual Production 300 Pieces
Production Hrs. Annual 2,168
Location (State) AZ
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $31,633 346,475 kWh $0.09
Electricity Demand $2,990 1,881 kW-months/year $1.59
Electricity Fees $2,643 - $ -
Natural Gas $31,766 5,079 MMBtu $6.25
TOTAL ENERGY COSTS $69,583
RECOMMENDED SAVINGS* $57,356 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $4,032
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Personnel Changes Administrative Changes Electricity Usage Electricity Demand Natural Gas Personnel Changes Administrative Changes
$ kWh $ kW-months/year $ MMBtu $ $ $ $
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,381
Cost:
$2,549
$1,138 15,314 $243 46 - - - - - - $1,138
15,314
kWh
$243
46
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$2,767
Cost:
$5,107
$1,980 22,354 $787 103 - - - - - - $1,980
22,354
kWh
$787
103
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
03: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$388
Cost:
$388
$279 3,759 $109 21 - - - - - - $279
3,759
kWh
$109
21
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
04: 3.6192 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL Savings:
$4,032
Cost:
$110
- - - - - - - - $4,032 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
$4,032
-
$
05: 4.454 MODIFY STARTUP/SHUTDOWN TIMES Savings:
$48,788
Cost:
$383
- - - - $28,559 4,178 $20,229 - - - -
-
kWh
-
-
kW-months/year
$28,559
4,178
MMBtu
$20,229
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$57,356
Cost:
$8,537
$3,397 41,427 $1,139 170 $28,559 4,178 $20,229 - $4,032 - $3,397
41,427
kWh
$1,139
170
kW-months/year
$28,559
4,178
MMBtu
$20,229
-
$
$4,032
-
$
TOTAL IMPLEMENTED Savings:
$4,032
Cost:
$110
- - - - - - - - $4,032 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
$4,032
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $
Electricity Usage Electricity Demand Natural Gas Personnel Changes Administrative Changes Electricity Usage Electricity Demand Natural Gas Personnel Changes Administrative Changes