Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Arizona State University |
---|---|
Assessment Year | 2001 |
Principal Product | Industrial and automotive spray booths |
NAICS | n/a |
SIC | 3444 - Sheet Metalwork |
Sales | $5,000,000-$10,000,000 |
# of Employees | 34 |
Plant Area (Sq.Ft.) | 12,000 |
Annual Production | 300 Pieces |
Production Hrs. Annual | 2,168 |
Location (State) | AZ |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $31,633 | 346,475 | kWh | $0.09 |
Electricity Demand | $2,990 | 1,881 | kW-months/year | $1.59 |
Electricity Fees | $2,643 | - | $ | - |
Natural Gas | $31,766 | 5,079 | MMBtu | $6.25 |
TOTAL ENERGY COSTS | $69,583 | |||
RECOMMENDED SAVINGS* | $57,356 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $4,032 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Personnel Changes | Administrative Changes | Electricity Usage | Electricity Demand | Natural Gas | Personnel Changes | Administrative Changes | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | $ | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $1,381 Cost: $2,549 |
$1,138 | 15,314 | $243 | 46 | - | - | - | - | - | - |
$1,138 15,314 kWh |
$243 46 kW-months/year |
- - MMBtu |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $2,767 Cost: $5,107 |
$1,980 | 22,354 | $787 | 103 | - | - | - | - | - | - |
$1,980 22,354 kWh |
$787 103 kW-months/year |
- - MMBtu |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $388 Cost: $388 |
$279 | 3,759 | $109 | 21 | - | - | - | - | - | - |
$279 3,759 kWh |
$109 21 kW-months/year |
- - MMBtu |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 3.6192 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL |
Savings: $4,032 Cost: $110 |
- | - | - | - | - | - | - | - | $4,032 | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
- - $ |
$4,032 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 4.454 MODIFY STARTUP/SHUTDOWN TIMES |
Savings: $48,788 Cost: $383 |
- | - | - | - | $28,559 | 4,178 | $20,229 | - | - | - |
- - kWh |
- - kW-months/year |
$28,559 4,178 MMBtu |
$20,229 - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $57,356 Cost: $8,537 |
$3,397 | 41,427 | $1,139 | 170 | $28,559 | 4,178 | $20,229 | - | $4,032 | - | $3,397 41,427 kWh |
$1,139 170 kW-months/year |
$28,559 4,178 MMBtu |
$20,229 - $ |
$4,032 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $4,032 Cost: $110 |
- | - | - | - | - | - | - | - | $4,032 | - | - - kWh |
- - kW-months/year |
- - MMBtu |
- - $ |
$4,032 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | $ | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Personnel Changes | Administrative Changes | Electricity Usage | Electricity Demand | Natural Gas | Personnel Changes | Administrative Changes |