IAC Assessment: AS0305
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: AS0305
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Arizona State University
Assessment Year 2001
Principal Product Fabricated Metal Products
NAICS n/a
SIC 3444 - Sheet Metalwork
Sales $10,000,000-$50,000,000
# of Employees 91
Plant Area (Sq.Ft.) 85,000
Annual Production 60,000 Pieces
Production Hrs. Annual 2,887
Location (State) AZ
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $62,442 973,110 kWh $0.06
Electricity Demand $9,335 3,972 kW-months/year $2.35
Electricity Fees $7,607 - $ -
Natural Gas $8,178 828 MMBtu $9.88
TOTAL ENERGY COSTS $92,729
RECOMMENDED SAVINGS* $92,965 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $82,551
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Administrative Changes Ancillary Material Cost One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Administrative Changes Ancillary Material Cost One-time Revenue or Avoided Cost
$ kWh $ kW-months/year $ $ $ $ $ $
01: 2.7145 INSTALL SKYLIGHTS Savings:
$8,175
Cost:
$16,112
$8,175 145,018 - - - - - - - - $8,175
145,018
kWh
-
-
kW-months/year
-
-
$
-
-
$
-
-
$
02: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$155
Cost:
$225
$116 2,062 $39 34 - - - - - - $116
2,062
kWh
$39
34
kW-months/year
-
-
$
-
-
$
-
-
$
03: 2.7232 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL Savings:
$1,492
Cost:
$3,850
$1,184 21,005 $308 90 - - - - - - $1,184
21,005
kWh
$308
90
kW-months/year
-
-
$
-
-
$
-
-
$
04: 2.4314 USE SYNTHETIC LUBRICANT Savings:
$592
Cost:
$277
$267 4,735 $112 20 - - $213 - - - $267
4,735
kWh
$112
20
kW-months/year
-
-
$
$213
-
$
-
-
$
05: 3.6192 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL Savings:
$4,588
Cost:
$110
- - - - $4,588 - - - - - -
-
kWh
-
-
kW-months/year
$4,588
-
$
-
-
$
-
-
$
06: 4.711 INITIATE A TOTAL QUALITY MANAGEMENT PROGRAM Savings:
$14,000
Cost:
$1,360
- - - - - - - - $14,000 - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
$
$14,000
-
$
07: 4.513 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS Savings:
$63,963
Cost:
$6,820
- - - - $63,963 - - - - - -
-
kWh
-
-
kW-months/year
$63,963
-
$
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$92,965
Cost:
$28,754
$9,742 172,820 $459 144 $68,551 - $213 - $14,000 - $9,742
172,820
kWh
$459
144
kW-months/year
$68,551
-
$
$213
-
$
$14,000
-
$
TOTAL IMPLEMENTED Savings:
$82,551
Cost:
$8,290
- - - - $68,551 - - - $14,000 - -
-
kWh
-
-
kW-months/year
$68,551
-
$
-
-
$
$14,000
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ $ $ $
Electricity Usage Electricity Demand Administrative Changes Ancillary Material Cost One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Administrative Changes Ancillary Material Cost One-time Revenue or Avoided Cost