IAC logo
IAC Assessment: AS0307
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: AS0307
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Arizona State University
Assessment Year 2001
Principal Product Salt
NAICS n/a
SIC 1479 - Chemical And Fertilizer Mining, Nec
Sales $1,000,000-$5,000,000
# of Employees 36
Plant Area (Sq.Ft.) 5,662,800
Annual Production 126,000 Tons
Production Hrs. Annual 5,638
Location (State) AZ
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $174,598 2,572,063 kWh $0.07
Electricity Demand $10,531 6,361 kW-months/year $1.66
Electricity Fees $11,381 - $ -
Natural Gas $175,806 30,270 MMBtu $5.81
TOTAL ENERGY COSTS $372,316
RECOMMENDED SAVINGS* $248,440 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Personnel Changes Administrative Changes Electricity Usage Electricity Demand Natural Gas Personnel Changes Administrative Changes
$ kWh $ kW-months/year $ MMBtu $ $ $ $
01: 2.6231 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED Savings:
$328
Cost:
$530
$328 7,192 - - - - - - - - $328
7,192
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
02: 2.1121 USE INSULATION IN FURNACES TO FACILITATE HEATING / COOLING Savings:
$4,902
Cost:
$30,252
- - - - $4,902 967 - - - - -
-
kWh
-
-
kW-months/year
$4,902
967
MMBtu
-
-
$
-
-
$
03: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$88
Cost:
$225
$46 1,004 $42 26 - - - - - - $46
1,004
kWh
$42
26
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
04: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$713
Cost:
$735
$522 11,476 $191 24 - - - - - - $522
11,476
kWh
$191
24
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
05: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$1,586
Cost:
$60
$1,162 25,510 $424 54 - - - - - - $1,162
25,510
kWh
$424
54
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
06: 3.6193 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS Savings:
$3,703
Cost:
$60
- - - - - - - - $3,703 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
$3,703
-
$
07: 4.441 INSTALL AUTOMATIC PACKING EQUIPMENT Savings:
$237,120
Cost:
$280,000
- - - - - - $237,120 - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$237,120
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$248,440
Cost:
$311,862
$2,058 45,182 $657 104 $4,902 967 $237,120 - $3,703 - $2,058
45,182
kWh
$657
104
kW-months/year
$4,902
967
MMBtu
$237,120
-
$
$3,703
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $
Electricity Usage Electricity Demand Natural Gas Personnel Changes Administrative Changes Electricity Usage Electricity Demand Natural Gas Personnel Changes Administrative Changes