Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Arizona State University |
---|---|
Assessment Year | 2001 |
Principal Product | Prefabricated Houses and Wood Buildings |
NAICS | n/a |
SIC | 2452 - Prefabricated Wood Buildings |
Sales | $5,000,000-$10,000,000 |
# of Employees | 35 |
Plant Area (Sq.Ft.) | 55,000 |
Annual Production | 694 Units |
Production Hrs. Annual | 2,268 |
Location (State) | AZ |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $4,950 | 79,680 | kWh | $0.06 |
Electricity Demand | $688 | 324 | kW-months/year | $2.12 |
Electricity Fees | $875 | - | $ | - |
TOTAL ENERGY COSTS | $6,513 | |||
RECOMMENDED SAVINGS* | $104,520 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $12,068 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Administrative Changes | Primary Raw Material | Electricity Usage | Electricity Demand | Administrative Changes | Primary Raw Material | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | $ | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $834 Cost: $2,736 |
$543 | 9,725 | $291 | 50 | - | - | - | - |
$543 9,725 kWh |
$291 50 kW-months/year |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.7135 INSTALL OCCUPANCY SENSORS |
Savings: $91 Cost: $450 |
$63 | 1,132 | $28 | 24 | - | - | - | - |
$63 1,132 kWh |
$28 24 kW-months/year |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $68 Cost: $60 |
$22 | 386 | $46 | 8 | - | - | - | - |
$22 386 kWh |
$46 8 kW-months/year |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.7232 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL |
Savings: $533 Cost: $1,400 |
$403 | 7,234 | $130 | 38 | - | - | - | - |
$403 7,234 kWh |
$130 38 kW-months/year |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 4.711 INITIATE A TOTAL QUALITY MANAGEMENT PROGRAM |
Savings: $12,000 Cost: $3,100 |
- | - | - | - | $12,000 | - | - | - |
- - kWh |
- - kW-months/year |
$12,000 - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 4.513 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS |
Savings: $54,594 Cost: $2,880 |
- | - | - | - | $54,594 | - | - | - |
- - kWh |
- - kW-months/year |
$54,594 - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 4.514 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE HANDLING COSTS |
Savings: $36,400 Cost: $10,400 |
- | - | - | - | - | - | $36,400 | - |
- - kWh |
- - kW-months/year |
- - $ |
$36,400 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $104,520 Cost: $21,026 |
$1,031 | 18,477 | $495 | 120 | $66,594 | - | $36,400 | - | $1,031 18,477 kWh |
$495 120 kW-months/year |
$66,594 - $ |
$36,400 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $12,068 Cost: $3,160 |
$22 | 386 | $46 | 8 | $12,000 | - | - | - | $22 386 kWh |
$46 8 kW-months/year |
$12,000 - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | $ | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Administrative Changes | Primary Raw Material | Electricity Usage | Electricity Demand | Administrative Changes | Primary Raw Material |