IAC logo
IAC Assessment: AS0310
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: AS0310
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Arizona State University
Assessment Year 2001
Principal Product Prefabricated Houses and Wood Buildings
NAICS n/a
SIC 2452 - Prefabricated Wood Buildings
Sales $5,000,000-$10,000,000
# of Employees 35
Plant Area (Sq.Ft.) 55,000
Annual Production 694 Units
Production Hrs. Annual 2,268
Location (State) AZ
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $4,950 79,680 kWh $0.06
Electricity Demand $688 324 kW-months/year $2.12
Electricity Fees $875 - $ -
TOTAL ENERGY COSTS $6,513
RECOMMENDED SAVINGS* $104,520 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $12,068
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Administrative Changes Primary Raw Material Electricity Usage Electricity Demand Administrative Changes Primary Raw Material
$ kWh $ kW-months/year $ $ $ $
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$834
Cost:
$2,736
$543 9,725 $291 50 - - - - $543
9,725
kWh
$291
50
kW-months/year
-
-
$
-
-
$
02: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$91
Cost:
$450
$63 1,132 $28 24 - - - - $63
1,132
kWh
$28
24
kW-months/year
-
-
$
-
-
$
03: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$68
Cost:
$60
$22 386 $46 8 - - - - $22
386
kWh
$46
8
kW-months/year
-
-
$
-
-
$
04: 2.7232 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL Savings:
$533
Cost:
$1,400
$403 7,234 $130 38 - - - - $403
7,234
kWh
$130
38
kW-months/year
-
-
$
-
-
$
05: 4.7110 INITIATE A TOTAL QUALITY MANAGEMENT PROGRAM Savings:
$12,000
Cost:
$3,100
- - - - $12,000 - - - -
-
kWh
-
-
kW-months/year
$12,000
-
$
-
-
$
06: 4.5130 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS Savings:
$54,594
Cost:
$2,880
- - - - $54,594 - - - -
-
kWh
-
-
kW-months/year
$54,594
-
$
-
-
$
07: 4.5140 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE HANDLING COSTS Savings:
$36,400
Cost:
$10,400
- - - - - - $36,400 - -
-
kWh
-
-
kW-months/year
-
-
$
$36,400
-
$
TOTAL RECOMMENDED Savings:
$104,520
Cost:
$21,026
$1,031 18,477 $495 120 $66,594 - $36,400 - $1,031
18,477
kWh
$495
120
kW-months/year
$66,594
-
$
$36,400
-
$
TOTAL IMPLEMENTED Savings:
$12,068
Cost:
$3,160
$22 386 $46 8 $12,000 - - - $22
386
kWh
$46
8
kW-months/year
$12,000
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ $
Electricity Usage Electricity Demand Administrative Changes Primary Raw Material Electricity Usage Electricity Demand Administrative Changes Primary Raw Material