IAC logo
IAC Assessment: AS0315
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: AS0315
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Arizona State University
Assessment Year 2001
Principal Product Paint
NAICS n/a
SIC 2851 - Paints And Allied Products
Sales $1,000,000-$5,000,000
# of Employees 32
Plant Area (Sq.Ft.) 208,000
Annual Production 264 Thousand Gallons
Production Hrs. Annual 2,142
Location (State) AZ
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $22,123 345,628 kWh $0.06
Electricity Demand $3,993 1,802 kW-months/year $2.22
Electricity Fees $3,102 - $ -
TOTAL ENERGY COSTS $29,218
RECOMMENDED SAVINGS* $37,212 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Other Liquid (non-haz) Personnel Changes Administrative Changes Electricity Usage Electricity Demand Other Liquid (non-haz) Personnel Changes Administrative Changes
$ kWh $ kW-months/year $ gal $ $ $ $
01: 2.4314 USE SYNTHETIC LUBRICANT Savings:
$221
Cost:
$174
$124 2,204 $72 15 $25 3 - - - - $124
2,204
kWh
$72
15
kW-months/year
$25
3
gal
-
-
$
-
-
$
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,749
Cost:
$7,491
$1,136 20,239 $613 105 - - - - - - $1,136
20,239
kWh
$613
105
kW-months/year
-
-
gal
-
-
$
-
-
$
03: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$105
Cost:
$525
$105 1,868 - - - - - - - - $105
1,868
kWh
-
-
kW-months/year
-
-
gal
-
-
$
-
-
$
04: 4.521 CLEAR AND RENT EXISTING SPACE Savings:
$32,448
Cost:
$3,360
- - - - - - - - $32,448 - -
-
kWh
-
-
kW-months/year
-
-
gal
-
-
$
$32,448
-
$
05: 4.322 ELIMINATE OLD STOCK AND MODIFY INVENTORY CONTROL Savings:
$81
Cost:
$306
- - - - - - - - $81 - -
-
kWh
-
-
kW-months/year
-
-
gal
-
-
$
$81
-
$
06: 4.445 INSTALL EQUIPMENT TO MOVE PRODUCT Savings:
$2,608
Cost:
$1,832
- - - - - - $2,608 - - - -
-
kWh
-
-
kW-months/year
-
-
gal
$2,608
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$37,212
Cost:
$13,688
$1,365 24,311 $685 120 $25 3 $2,608 - $32,529 - $1,365
24,311
kWh
$685
120
kW-months/year
$25
3
gal
$2,608
-
$
$32,529
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
gal
-
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ gal $ $ $ $
Electricity Usage Electricity Demand Other Liquid (non-haz) Personnel Changes Administrative Changes Electricity Usage Electricity Demand Other Liquid (non-haz) Personnel Changes Administrative Changes