Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Arizona State University |
---|---|
Assessment Year | 2001 |
Principal Product | Paint |
NAICS | n/a |
SIC | 2851 - Paints And Allied Products |
Sales | $1,000,000-$5,000,000 |
# of Employees | 32 |
Plant Area (Sq.Ft.) | 208,000 |
Annual Production | 264 Thousand Gallons |
Production Hrs. Annual | 2,142 |
Location (State) | AZ |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $22,123 | 345,628 | kWh | $0.06 |
Electricity Demand | $3,993 | 1,802 | kW-months/year | $2.22 |
Electricity Fees | $3,102 | - | $ | - |
TOTAL ENERGY COSTS | $29,218 | |||
RECOMMENDED SAVINGS* | $37,212 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | - |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Other Liquid (non-haz) | Personnel Changes | Administrative Changes | Electricity Usage | Electricity Demand | Other Liquid (non-haz) | Personnel Changes | Administrative Changes | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | gal | $ | $ | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.4314 USE SYNTHETIC LUBRICANT |
Savings: $221 Cost: $174 |
$124 | 2,204 | $72 | 15 | $25 | 3 | - | - | - | - |
$124 2,204 kWh |
$72 15 kW-months/year |
$25 3 gal |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $1,749 Cost: $7,491 |
$1,136 | 20,239 | $613 | 105 | - | - | - | - | - | - |
$1,136 20,239 kWh |
$613 105 kW-months/year |
- - gal |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.7135 INSTALL OCCUPANCY SENSORS |
Savings: $105 Cost: $525 |
$105 | 1,868 | - | - | - | - | - | - | - | - |
$105 1,868 kWh |
- - kW-months/year |
- - gal |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 4.521 CLEAR AND RENT EXISTING SPACE |
Savings: $32,448 Cost: $3,360 |
- | - | - | - | - | - | - | - | $32,448 | - |
- - kWh |
- - kW-months/year |
- - gal |
- - $ |
$32,448 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 4.322 ELIMINATE OLD STOCK AND MODIFY INVENTORY CONTROL |
Savings: $81 Cost: $306 |
- | - | - | - | - | - | - | - | $81 | - |
- - kWh |
- - kW-months/year |
- - gal |
- - $ |
$81 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 4.445 INSTALL EQUIPMENT TO MOVE PRODUCT |
Savings: $2,608 Cost: $1,832 |
- | - | - | - | - | - | $2,608 | - | - | - |
- - kWh |
- - kW-months/year |
- - gal |
$2,608 - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $37,212 Cost: $13,688 |
$1,365 | 24,311 | $685 | 120 | $25 | 3 | $2,608 | - | $32,529 | - | $1,365 24,311 kWh |
$685 120 kW-months/year |
$25 3 gal |
$2,608 - $ |
$32,529 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: - Cost: - |
- | - | - | - | - | - | - | - | - | - | - - kWh |
- - kW-months/year |
- - gal |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | gal | $ | $ | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Other Liquid (non-haz) | Personnel Changes | Administrative Changes | Electricity Usage | Electricity Demand | Other Liquid (non-haz) | Personnel Changes | Administrative Changes |