Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Arizona State University |
---|---|
Assessment Year | 2002 |
Principal Product | Kitchen and bathroom wood cabinets |
NAICS | n/a |
SIC | 2434 - Wood Kitchen Cabinets |
Sales | $10,000,000-$50,000,000 |
# of Employees | 260 |
Plant Area (Sq.Ft.) | 135,000 |
Annual Production | 1,000,000 Pieces |
Production Hrs. Annual | 6,006 |
Location (State) | NV |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $105,227 | 1,682,070 | kWh | $0.06 |
Electricity Demand | $20,171 | 4,394 | kW-months/year | $4.59 |
Electricity Fees | $15,349 | - | $ | - |
TOTAL ENERGY COSTS | $140,747 | |||
RECOMMENDED SAVINGS* | $175,254 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $164,605 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Solid Waste (non-haz) | Personnel Changes | Administrative Changes | Electricity Usage | Electricity Demand | Solid Waste (non-haz) | Personnel Changes | Administrative Changes | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | lb | $ | $ | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $23,932 Cost: $220 |
$20,202 | 285,746 | $3,730 | 635 | - | - | - | - | - | - |
$20,202 285,746 kWh |
$3,730 635 kW-months/year |
- - lb |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $3,163 Cost: $3,020 |
$2,757 | 38,632 | $406 | 68 | - | - | - | - | - | - |
$2,757 38,632 kWh |
$406 68 kW-months/year |
- - lb |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.7135 INSTALL OCCUPANCY SENSORS |
Savings: $276 Cost: $375 |
$227 | 3,183 | $49 | 7 | - | - | - | - | - | - |
$227 3,183 kWh |
$49 7 kW-months/year |
- - lb |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.7121 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT |
Savings: $6,114 Cost: $540 |
$6,114 | 86,486 | - | - | - | - | - | - | - | - |
$6,114 86,486 kWh |
- - kW-months/year |
- - lb |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.7221 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA |
Savings: $633 Cost: - |
$481 | 6,734 | $152 | 44 | - | - | - | - | - | - |
$481 6,734 kWh |
$152 44 kW-months/year |
- - lb |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.7232 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL |
Savings: $1,096 Cost: $2,100 |
$955 | 13,371 | $141 | 52 | - | - | - | - | - | - |
$955 13,371 kWh |
$141 52 kW-months/year |
- - lb |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 3.5248 SEPARATE AND RECYCLE SCRAP METAL TO FOUNDRY OR FOR SALE |
Savings: $1,800 Cost: $154 |
- | - | - | - | $1,800 | 300,000 | - | - | - | - |
- - kWh |
- - kW-months/year |
$1,800 300,000 lb |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 4.111 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK |
Savings: $29,052 Cost: $6,600 |
- | - | - | - | - | - | $29,052 | - | - | - |
- - kWh |
- - kW-months/year |
- - lb |
$29,052 - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
09: 4.513 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS |
Savings: $109,188 Cost: $7,050 |
- | - | - | - | - | - | - | - | $109,188 | - |
- - kWh |
- - kW-months/year |
- - lb |
- - $ |
$109,188 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $175,254 Cost: $20,059 |
$30,736 | 434,152 | $4,478 | 806 | $1,800 | 300,000 | $29,052 | - | $109,188 | - | $30,736 434,152 kWh |
$4,478 806 kW-months/year |
$1,800 300,000 lb |
$29,052 - $ |
$109,188 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $164,605 Cost: $14,024 |
$20,683 | 292,480 | $3,882 | 679 | $1,800 | 300,000 | $29,052 | - | $109,188 | - | $20,683 292,480 kWh |
$3,882 679 kW-months/year |
$1,800 300,000 lb |
$29,052 - $ |
$109,188 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | lb | $ | $ | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||