IAC logo
IAC Assessment: AS0327
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: AS0327
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Arizona State University
Assessment Year 2002
Principal Product Metal plating, electroplating, anodizing
NAICS n/a
SIC 3471 - Plating And Polishing
Sales $5,000,000-$10,000,000
# of Employees 85
Plant Area (Sq.Ft.) 66,000
Annual Production 0 Units
Production Hrs. Annual 4,048
Location (State) AZ
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $243,229 4,016,960 kWh $0.06
Electricity Demand $15,848 9,590 kW-months/year $1.65
Electricity Fees $18,888 - $ -
Natural Gas $95,020 10,845 MMBtu $8.76
TOTAL ENERGY COSTS $411,520
RECOMMENDED SAVINGS* $117,870 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $42,030
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Solid Waste (non-haz) Administrative Changes Electricity Usage Electricity Demand Solid Waste (non-haz) Administrative Changes
$ kWh $ kW-months/year $ lb $ $
01: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$28,614
Cost:
$200
$23,156 502,304 $5,458 690 - - - - $23,156
502,304
kWh
$5,458
690
kW-months/year
-
-
lb
-
-
$
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$7,154
Cost:
$10,992
$5,031 109,141 $2,123 268 - - - - $5,031
109,141
kWh
$2,123
268
kW-months/year
-
-
lb
-
-
$
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,352
Cost:
$3,671
$896 19,447 $456 58 - - - - $896
19,447
kWh
$456
58
kW-months/year
-
-
lb
-
-
$
04: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$4,661
Cost:
$60
$3,759 81,534 $902 114 - - - - $3,759
81,534
kWh
$902
114
kW-months/year
-
-
lb
-
-
$
05: 2.7232 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL Savings:
$863
Cost:
$2,450
$512 11,115 $351 83 - - - - $512
11,115
kWh
$351
83
kW-months/year
-
-
lb
-
-
$
06: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$9,397
Cost:
$2,000
$9,397 203,840 - - - - - - $9,397
203,840
kWh
-
-
kW-months/year
-
-
lb
-
-
$
07: 3.5315 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER Savings:
$1,255
Cost:
$60
- - - - $1,255 26,000 - - -
-
kWh
-
-
kW-months/year
$1,255
26,000
lb
-
-
$
08: 3.6193 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS Savings:
$12,220
Cost:
$20,500
- - - - $12,220 84,000 - - -
-
kWh
-
-
kW-months/year
$12,220
84,000
lb
-
-
$
09: 4.5210 CLEAR AND RENT EXISTING SPACE Savings:
$50,550
Cost:
$7,748
- - - - - - $50,550 - -
-
kWh
-
-
kW-months/year
-
-
lb
$50,550
-
$
10: 4.1110 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK Savings:
$1,804
Cost:
$108
- - - - - - $1,804 - -
-
kWh
-
-
kW-months/year
-
-
lb
$1,804
-
$
TOTAL RECOMMENDED Savings:
$117,870
Cost:
$47,789
$42,751 927,381 $9,290 1,213 $13,475 110,000 $52,354 - $42,751
927,381
kWh
$9,290
1,213
kW-months/year
$13,475
110,000
lb
$52,354
-
$
TOTAL IMPLEMENTED Savings:
$42,030
Cost:
$8,429
$33,961 736,706 $6,265 831 - - $1,804 - $33,961
736,706
kWh
$6,265
831
kW-months/year
-
-
lb
$1,804
-
$
Savings
Cost
$ kWh $ kW-months/year $ lb $ $
Electricity Usage Electricity Demand Solid Waste (non-haz) Administrative Changes Electricity Usage Electricity Demand Solid Waste (non-haz) Administrative Changes