IAC logo
IAC Assessment: AS0330
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: AS0330
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Arizona State University
Assessment Year 2002
Principal Product Bee Pollen Products
NAICS n/a
SIC 2032 - Canned Specialties
Sales $10,000,000-$50,000,000
# of Employees 45
Plant Area (Sq.Ft.) 43,000
Annual Production 2,500,000 Pieces
Production Hrs. Annual 2,151
Location (State) AZ
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $21,921 679,734 kWh $0.03
Electricity Demand $9,635 5,603 kW-months/year $1.72
Electricity Fees $12,290 - $ -
Natural Gas $1,270 104 MMBtu $12.21
TOTAL ENERGY COSTS $45,116
RECOMMENDED SAVINGS* $28,089 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Solid Waste (non-haz) Personnel Changes Administrative Changes Ancillary Material Cost Electricity Usage Electricity Demand Solid Waste (non-haz) Personnel Changes Administrative Changes Ancillary Material Cost
$ kWh $ kW-months/year $ lb $ $ $ $ $ $
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,018
Cost:
$3,240
$596 12,260 $350 60 - - - - - - $72 - $596
12,260
kWh
$350
60
kW-months/year
-
-
lb
-
-
$
-
-
$
$72
-
$
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$948
Cost:
$3,673
$666 13,659 $282 55 - - - - - - - - $666
13,659
kWh
$282
55
kW-months/year
-
-
lb
-
-
$
-
-
$
-
-
$
03: 2.7145 INSTALL SKYLIGHTS Savings:
$1,360
Cost:
$5,352
$1,360 27,982 - - - - - - - - - - $1,360
27,982
kWh
-
-
kW-months/year
-
-
lb
-
-
$
-
-
$
-
-
$
04: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$230
Cost:
$975
$164 3,358 $66 72 - - - - - - - - $164
3,358
kWh
$66
72
kW-months/year
-
-
lb
-
-
$
-
-
$
-
-
$
05: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$256
Cost:
$60
$139 2,862 $117 23 - - - - - - - - $139
2,862
kWh
$117
23
kW-months/year
-
-
lb
-
-
$
-
-
$
-
-
$
06: 3.5217 REUSE / RECYCLE/ SELL PAPER PRODUCTS Savings:
$832
Cost:
$60
- - - - $832 24,000 - - - - - - -
-
kWh
-
-
kW-months/year
$832
24,000
lb
-
-
$
-
-
$
-
-
$
07: 4.1230 REDUCE DEFECTS BY REDUCING PRODUCT TIPPING Savings:
$259
Cost:
$65
$92 1,894 $59 12 - - $108 - - - - - $92
1,894
kWh
$59
12
kW-months/year
-
-
lb
$108
-
$
-
-
$
-
-
$
08: 4.5130 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS Savings:
$23,186
Cost:
$8,988
- - - - - - - - $23,186 - - - -
-
kWh
-
-
kW-months/year
-
-
lb
-
-
$
$23,186
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$28,089
Cost:
$22,413
$3,017 62,015 $874 222 $832 24,000 $108 - $23,186 - $72 - $3,017
62,015
kWh
$874
222
kW-months/year
$832
24,000
lb
$108
-
$
$23,186
-
$
$72
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
lb
-
-
$
-
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ lb $ $ $ $ $ $
Electricity Usage Electricity Demand Solid Waste (non-haz) Personnel Changes Administrative Changes Ancillary Material Cost Electricity Usage Electricity Demand Solid Waste (non-haz) Personnel Changes Administrative Changes Ancillary Material Cost