Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Arizona State University |
---|---|
Assessment Year | 2002 |
Principal Product | Canvas boat tops and covers |
NAICS | n/a |
SIC | 2394 - Canvas And Related Products |
Sales | $10,000,000-$50,000,000 |
# of Employees | 103 |
Plant Area (Sq.Ft.) | 46,000 |
Annual Production | 60,000 Pieces |
Production Hrs. Annual | 4,572 |
Location (State) | AZ |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $25,946 | 407,048 | kWh | $0.06 |
Electricity Demand | $3,800 | 1,544 | kW-months/year | $2.46 |
Electricity Fees | $2,805 | - | $ | - |
Natural Gas | $5,366 | 472 | MMBtu | $11.37 |
TOTAL ENERGY COSTS | $37,917 | |||
RECOMMENDED SAVINGS* | $78,179 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $909 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Administrative Changes | Ancillary Material Cost | Electricity Usage | Electricity Demand | Administrative Changes | Ancillary Material Cost | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | $ | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $909 Cost: $4,165 |
$615 | 10,719 | $247 | 42 | - | - | $47 | - |
$615 10,719 kWh |
$247 42 kW-months/year |
- - $ |
$47 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.7135 INSTALL OCCUPANCY SENSORS |
Savings: $373 Cost: $1,050 |
$373 | 6,175 | - | - | - | - | - | - |
$373 6,175 kWh |
- - kW-months/year |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $1,133 Cost: $750 |
$904 | 14,952 | $229 | 40 | - | - | - | - |
$904 14,952 kWh |
$229 40 kW-months/year |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.7232 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL |
Savings: $580 Cost: $1,750 |
$404 | 7,147 | $176 | 96 | - | - | - | - |
$404 7,147 kWh |
$176 96 kW-months/year |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 4.424 IMPROVE SPACE COMFORT CONDITIONING |
Savings: $75,184 Cost: $3,302 |
- | - | - | - | $75,184 | - | - | - |
- - kWh |
- - kW-months/year |
$75,184 - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $78,179 Cost: $11,017 |
$2,296 | 38,993 | $652 | 178 | $75,184 | - | $47 | - | $2,296 38,993 kWh |
$652 178 kW-months/year |
$75,184 - $ |
$47 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $909 Cost: $4,165 |
$615 | 10,719 | $247 | 42 | - | - | $47 | - | $615 10,719 kWh |
$247 42 kW-months/year |
- - $ |
$47 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | $ | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Administrative Changes | Ancillary Material Cost | Electricity Usage | Electricity Demand | Administrative Changes | Ancillary Material Cost |