IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Arizona State University
Assessment Year 2002
Principal Product Photo masks, glass plates for PC chips, etching glass, and chrome
NAICS n/a
SIC 3674 - Semiconductors And Related Devices
Sales $10,000,000-$50,000,000
# of Employees 120
Plant Area (Sq.Ft.) 30,000
Annual Production 26,280 Pieces
Production Hrs. Annual 8,760
Location (State) AZ
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $282,938 5,784,960 kWh $0.05
Electricity Demand $24,610 9,721 kW-months/year $2.53
Electricity Fees $27,657 - $ -
Natural Gas $36,527 4,105 MMBtu $8.90
TOTAL ENERGY COSTS $388,928
RECOMMENDED SAVINGS* $55,352 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Water Disposal Administrative Changes Electricity Usage Electricity Demand Natural Gas Water Disposal Administrative Changes
$ kWh $ kW-months/year $ MMBtu $ Tgal $ $
01: 2.6212 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME Savings:
$2,317
Cost:
-
$2,317 65,989 - - - - - - - - $2,317
65,989
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
02: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS Savings:
$1,247
Cost:
$312
$414 8,279 $833 60 - - - - - - $414
8,279
kWh
$833
60
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
03: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$667
Cost:
$1,350
$348 9,899 $319 116 - - - - - - $348
9,899
kWh
$319
116
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
04: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$424
Cost:
$441
$263 7,472 $161 12 - - - - - - $263
7,472
kWh
$161
12
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
05: 2.7272 INSTALL HEAT PIPES / RAISE COOLING SETPOINT Savings:
$32,221
Cost:
$12,000
- - - - $32,221 3,836 - - - - -
-
kWh
-
-
kW-months/year
$32,221
3,836
MMBtu
-
-
Tgal
-
-
$
06: 2.7225 CLOSE OUTDOOR AIR DAMPERS DURING WARM-UP / COOL-DOWN PERIODS Savings:
$3,596
Cost:
$60
$2,338 66,576 $1,258 91 - - - - - - $2,338
66,576
kWh
$1,258
91
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
07: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$3,710
Cost:
$5,232
$2,594 73,868 $1,116 101 - - - - - - $2,594
73,868
kWh
$1,116
101
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
08: 2.7442 KEEP DOORS AND WINDOWS SHUT WHEN NOT ON USE Savings:
$3,926
Cost:
$85
$2,589 73,730 $1,337 485 - - - - - - $2,589
73,730
kWh
$1,337
485
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
09: 3.4111 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION Savings:
$6,865
Cost:
$8,955
- - - - - - $6,865 3,570,000 - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$6,865
3,570,000
Tgal
-
-
$
10: 4.111 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK Savings:
$379
Cost:
$546
- - - - - - - - $379 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
$379
-
$
TOTAL RECOMMENDED Savings:
$55,352
Cost:
$28,981
$10,863 305,813 $5,024 865 $32,221 3,836 $6,865 3,570,000 $379 - $10,863
305,813
kWh
$5,024
865
kW-months/year
$32,221
3,836
MMBtu
$6,865
3,570,000
Tgal
$379
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ Tgal $ $
Electricity Usage Electricity Demand Natural Gas Water Disposal Administrative Changes Electricity Usage Electricity Demand Natural Gas Water Disposal Administrative Changes