IAC logo
IAC Assessment: AS0337
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: AS0337
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Arizona State University
Assessment Year 2002
Principal Product Trusses
NAICS n/a
SIC 2421 - Sawmills And Planing Mills, General
Sales $10,000,000-$50,000,000
# of Employees 150
Plant Area (Sq.Ft.) 105,720
Annual Production 20,350 Thousand Feet
Production Hrs. Annual 6,100
Location (State) NV
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $82,975 1,294,068 kWh $0.06
Electricity Demand $5,744 2,834 kW-months/year $2.03
Electricity Fees $16,078 - $ -
Natural Gas $3,654 391 MMBtu $9.35
TOTAL ENERGY COSTS $113,200
RECOMMENDED SAVINGS* $58,829 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $35,855
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Administrative Changes Electricity Usage Electricity Demand Administrative Changes
$ kWh $ kW-months/year $ $
01: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$23,605
Cost:
$180
$19,957 275,720 $3,648 542 - - $19,957
275,720
kWh
$3,648
542
kW-months/year
-
-
$
02: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$1,017
Cost:
$11
$775 10,715 $242 24 - - $775
10,715
kWh
$242
24
kW-months/year
-
-
$
03: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$543
Cost:
$1,875
$385 5,318 $158 120 - - $385
5,318
kWh
$158
120
kW-months/year
-
-
$
04: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$209
Cost:
$164
$177 2,449 $32 5 - - $177
2,449
kWh
$32
5
kW-months/year
-
-
$
05: 2.7232 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL Savings:
$3,723
Cost:
$16,500
$2,841 39,268 $882 131 - - $2,841
39,268
kWh
$882
131
kW-months/year
-
-
$
06: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$3,736
Cost:
$4,622
$3,736 51,616 - - - - $3,736
51,616
kWh
-
-
kW-months/year
-
-
$
07: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$3,565
Cost:
$60
$3,565 49,249 - - - - $3,565
49,249
kWh
-
-
kW-months/year
-
-
$
08: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$11,034
Cost:
$5,800
$9,624 132,973 $1,410 262 - - $9,624
132,973
kWh
$1,410
262
kW-months/year
-
-
$
09: 3.6124 BURN WASTE OIL FOR HEAT Savings:
$5,757
Cost:
$9,000
$536 7,411 $497 222 $4,724 - $536
7,411
kWh
$497
222
kW-months/year
$4,724
-
$
10: 3.5242 RECOVER METALS FROM SPENT SOLUTIONS AND RECYCLE Savings:
$5,640
Cost:
$60
- - - - $5,640 - -
-
kWh
-
-
kW-months/year
$5,640
-
$
TOTAL RECOMMENDED Savings:
$58,829
Cost:
$38,272
$41,596 574,719 $6,869 1,306 $10,364 - $41,596
574,719
kWh
$6,869
1,306
kW-months/year
$10,364
-
$
TOTAL IMPLEMENTED Savings:
$35,855
Cost:
$21,537
$31,051 429,017 $4,804 702 - - $31,051
429,017
kWh
$4,804
702
kW-months/year
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ $
Electricity Usage Electricity Demand Administrative Changes Electricity Usage Electricity Demand Administrative Changes