IAC logo
IAC Assessment: AS0341
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: AS0341
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Arizona State University
Assessment Year 2003
Principal Product Bottled Water
NAICS 312112 - Bottled Water Manufacturing
SIC 3999 - Manufacturing Industries, Nec
Sales $5,000,000-$10,000,000
# of Employees 94
Plant Area (Sq.Ft.) 11,000
Annual Production 3,352,683 Pieces
Production Hrs. Annual 2,000
Location (State) AZ
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $143,600 2,338,560 kWh $0.06
Electricity Demand $9,010 5,614 kW-months/year $1.60
Electricity Fees $11,877 - $ -
Natural Gas $25,641 2,830 MMBtu $9.06
TOTAL ENERGY COSTS $216,120
RECOMMENDED SAVINGS* $110,953 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $23,614
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Water Disposal Personnel Changes Increase in Production Electricity Usage Electricity Demand Water Disposal Personnel Changes Increase in Production
$ kWh $ kW-months/year $ Tgal $ $ $ %
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$2,096
Cost:
$6,789
$344 7,467 $1,752 222 - - - - - - $344
7,467
kWh
$1,752
222
kW-months/year
-
-
Tgal
-
-
$
-
-
%
02: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS Savings:
$834
Cost:
$891
$411 21,792 $423 131 - - - - - - $411
21,792
kWh
$423
131
kW-months/year
-
-
Tgal
-
-
$
-
-
%
03: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$1,327
Cost:
$40
$655 14,203 $672 7 - - - - - - $655
14,203
kWh
$672
7
kW-months/year
-
-
Tgal
-
-
$
-
-
%
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$22,287
Cost:
$260
$9,729 211,680 $12,558 1,588 - - - - - - $9,729
211,680
kWh
$12,558
1,588
kW-months/year
-
-
Tgal
-
-
$
-
-
%
05: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$193
Cost:
$442
$193 4,175 - - - - - - - - $193
4,175
kWh
-
-
kW-months/year
-
-
Tgal
-
-
$
-
-
%
06: 3.4156 USE FLOW CONTROL VALVES ON EQUIPMENT TO OPTIMIZE WATER USE Savings:
$20,939
Cost:
-
- - - - $20,939 43,084 - - - - -
-
kWh
-
-
kW-months/year
$20,939
43,084
Tgal
-
-
$
-
-
%
07: 4.6110 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE Savings:
$23,277
Cost:
$14,364
- - - - - - - - $23,277 - -
-
kWh
-
-
kW-months/year
-
-
Tgal
-
-
$
$23,277
-
%
08: 4.4410 INSTALL AUTOMATIC PACKING EQUIPMENT Savings:
$40,000
Cost:
$616
- - - - - - $40,000 - - - -
-
kWh
-
-
kW-months/year
-
-
Tgal
$40,000
-
$
-
-
%
TOTAL RECOMMENDED Savings:
$110,953
Cost:
$23,402
$11,332 259,317 $15,405 1,948 $20,939 43,084 $40,000 - $23,277 - $11,332
259,317
kWh
$15,405
1,948
kW-months/year
$20,939
43,084
Tgal
$40,000
-
$
$23,277
-
%
TOTAL IMPLEMENTED Savings:
$23,614
Cost:
$300
$10,384 225,883 $13,230 1,595 - - - - - - $10,384
225,883
kWh
$13,230
1,595
kW-months/year
-
-
Tgal
-
-
$
-
-
%
Savings
Cost
$ kWh $ kW-months/year $ Tgal $ $ $ %
Electricity Usage Electricity Demand Water Disposal Personnel Changes Increase in Production Electricity Usage Electricity Demand Water Disposal Personnel Changes Increase in Production