IAC logo
IAC Assessment: AS0347
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: AS0347
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Arizona State University
Assessment Year 2003
Principal Product Ceramic Microelectronics Packages for Wireless and Digital Applications
NAICS 334413 - Semiconductor and Related Device Manufacturing
SIC 3674 - Semiconductors And Related Devices
Sales $5,000,000-$10,000,000
# of Employees 60
Plant Area (Sq.Ft.) 35,000
Annual Production 372,000 Units
Production Hrs. Annual 2,358
Location (State) AZ
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $75,228 1,295,520 kWh $0.06
Electricity Demand $9,362 3,682 kW-months/year $2.54
Electricity Fees $6,803 - $ -
TOTAL ENERGY COSTS $94,025
RECOMMENDED SAVINGS* $132,567 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $12,349
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Solid Waste (non-haz) Administrative Changes Increase in Production Electricity Usage Electricity Demand Solid Waste (non-haz) Administrative Changes Increase in Production
$ kWh $ kW-months/year $ lb $ $ $ %
01: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$1,462
Cost:
-
$1,102 27,818 $360 55 - - - - - - $1,102
27,818
kWh
$360
55
kW-months/year
-
-
lb
-
-
$
-
-
%
02: 2.7232 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL Savings:
$8,330
Cost:
$8,920
$5,417 137,094 $2,913 540 - - - - - - $5,417
137,094
kWh
$2,913
540
kW-months/year
-
-
lb
-
-
$
-
-
%
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$1,837
Cost:
$60
$899 22,696 $938 116 - - - - - - $899
22,696
kWh
$938
116
kW-months/year
-
-
lb
-
-
$
-
-
%
04: 2.7232 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL Savings:
$10,657
Cost:
$18,000
$7,689 194,111 $2,968 552 - - - - - - $7,689
194,111
kWh
$2,968
552
kW-months/year
-
-
lb
-
-
$
-
-
%
05: 2.2511 INSULATE BARE EQUIPMENT Savings:
$3,155
Cost:
$14
$1,543 39,027 $1,612 199 - - - - - - $1,543
39,027
kWh
$1,612
199
kW-months/year
-
-
lb
-
-
$
-
-
%
06: 3.5217 REUSE / RECYCLE/ SELL PAPER PRODUCTS Savings:
$720
Cost:
$40
- - - - $720 32,000 - - - - -
-
kWh
-
-
kW-months/year
$720
32,000
lb
-
-
$
-
-
%
07: 4.514 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE HANDLING COSTS Savings:
$27,104
Cost:
$6,400
- - - - - - $27,104 - - - -
-
kWh
-
-
kW-months/year
-
-
lb
$27,104
-
$
-
-
%
08: 4.111 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK Savings:
$64,137
Cost:
$800
- - - - - - - - $64,137 - -
-
kWh
-
-
kW-months/year
-
-
lb
-
-
$
$64,137
-
%
09: 4.521 CLEAR AND RENT EXISTING SPACE Savings:
$15,165
Cost:
$11,220
- - - - - - $15,165 - - - -
-
kWh
-
-
kW-months/year
-
-
lb
$15,165
-
$
-
-
%
TOTAL RECOMMENDED Savings:
$132,567
Cost:
$45,454
$16,650 420,746 $8,791 1,462 $720 32,000 $42,269 - $64,137 - $16,650
420,746
kWh
$8,791
1,462
kW-months/year
$720
32,000
lb
$42,269
-
$
$64,137
-
%
TOTAL IMPLEMENTED Savings:
$12,349
Cost:
$9,020
$7,418 187,608 $4,211 711 $720 32,000 - - - - $7,418
187,608
kWh
$4,211
711
kW-months/year
$720
32,000
lb
-
-
$
-
-
%
Savings
Cost
$ kWh $ kW-months/year $ lb $ $ $ %
Electricity Usage Electricity Demand Solid Waste (non-haz) Administrative Changes Increase in Production Electricity Usage Electricity Demand Solid Waste (non-haz) Administrative Changes Increase in Production