IAC logo
IAC Assessment: AS0350
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: AS0350
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Arizona State University
Assessment Year 2003
Principal Product Vitamins and Dietary Supplements
NAICS 325411 - Medicinal and Botanical Manufacturing
SIC 2833 - Medicinals And Botanicals
Sales $10,000,000-$50,000,000
# of Employees 110
Plant Area (Sq.Ft.) 95,000
Annual Production 0 Units
Production Hrs. Annual 4,221
Location (State) NV
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $159,246 2,399,956 kWh $0.07
Electricity Demand $15,226 4,274 kW-months/year $3.56
Electricity Fees $36,059 - $ -
Natural Gas $7,709 1,032 MMBtu $7.47
TOTAL ENERGY COSTS $218,240
RECOMMENDED SAVINGS* $51,197 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Water Disposal Personnel Changes Electricity Usage Electricity Demand Water Disposal Personnel Changes
$ kWh $ kW-months/year $ Tgal $ $
01: 2.7145 INSTALL SKYLIGHTS Savings:
$2,149
Cost:
$8,264
$2,149 32,713 - - - - - - $2,149
32,713
kWh
-
-
kW-months/year
-
-
Tgal
-
-
$
02: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS Savings:
$2,205
Cost:
$255
$1,832 26,494 $373 113 - - - - $1,832
26,494
kWh
$373
113
kW-months/year
-
-
Tgal
-
-
$
03: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$1,132
Cost:
$1,575
$1,132 16,368 - - - - - - $1,132
16,368
kWh
-
-
kW-months/year
-
-
Tgal
-
-
$
04: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$1,590
Cost:
$20
$1,386 21,089 $204 60 - - - - $1,386
21,089
kWh
$204
60
kW-months/year
-
-
Tgal
-
-
$
05: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$2,725
Cost:
$2,550
$2,385 36,301 $340 103 - - - - $2,385
36,301
kWh
$340
103
kW-months/year
-
-
Tgal
-
-
$
06: 3.4111 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION Savings:
$921
Cost:
$1,300
- - - - $921 460,684 - - -
-
kWh
-
-
kW-months/year
$921
460,684
Tgal
-
-
$
07: 4.441 INSTALL AUTOMATIC PACKING EQUIPMENT Savings:
$40,475
Cost:
$57,000
- - - - - - $40,475 - -
-
kWh
-
-
kW-months/year
-
-
Tgal
$40,475
-
$
TOTAL RECOMMENDED Savings:
$51,197
Cost:
$70,964
$8,884 132,965 $917 276 $921 460,684 $40,475 - $8,884
132,965
kWh
$917
276
kW-months/year
$921
460,684
Tgal
$40,475
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
Tgal
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ Tgal $ $
Electricity Usage Electricity Demand Water Disposal Personnel Changes Electricity Usage Electricity Demand Water Disposal Personnel Changes