Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Arizona State University |
---|---|
Assessment Year | 2003 |
Principal Product | Pre-cast concrete manholes and water vaults |
NAICS | 327332 - Concrete Pipe Manufacturing |
SIC | 3272 - Concrete Products, Nec |
Sales | $1,000,000-$5,000,000 |
# of Employees | 55 |
Plant Area (Sq.Ft.) | 435,600 |
Annual Production | 14,000 Bushels |
Production Hrs. Annual | 4,445 |
Location (State) | NV |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $17,550 | 238,776 | kWh | $0.07 |
Electricity Demand | $1,312 | 1,066 | kW-months/year | $1.23 |
Electricity Fees | $5,239 | - | $ | - |
Other Energy | $35,701 | 11,090 | MMBtu | $3.22 |
TOTAL ENERGY COSTS | $59,802 | |||
RECOMMENDED SAVINGS* | $44,940 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $44,368 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Fuel Oil #2 | Increase in Production | Electricity Usage | Electricity Demand | Fuel Oil #2 | Increase in Production | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | % | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $110 Cost: $15 |
$110 | 1,469 | - | - | - | - | - | - |
$110 1,469 kWh |
- - kW-months/year |
- - MMBtu |
- - % |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $7,729 Cost: $60 |
$7,602 | 101,424 | $127 | 274 | - | - | - | - |
$7,602 101,424 kWh |
$127 274 kW-months/year |
- - MMBtu |
- - % |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.7232 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL |
Savings: $462 Cost: $1,000 |
$457 | 6,096 | $5 | 19 | - | - | - | - |
$457 6,096 kWh |
$5 19 kW-months/year |
- - MMBtu |
- - % |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.1331 BURN A LESS EXPENSIVE GRADE OF FUEL |
Savings: $26,419 Cost: $6,500 |
- | - | - | - | $26,419 | 685 | - | - |
- - kWh |
- - kW-months/year |
$26,419 685 MMBtu |
- - % |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 4.514 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE HANDLING COSTS |
Savings: $10,220 Cost: $805 |
- | - | - | - | - | - | $10,220 | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
$10,220 - % |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $44,940 Cost: $8,380 |
$8,169 | 108,989 | $132 | 293 | $26,419 | 685 | $10,220 | - | $8,169 108,989 kWh |
$132 293 kW-months/year |
$26,419 685 MMBtu |
$10,220 - % |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $44,368 Cost: $7,365 |
$7,602 | 101,424 | $127 | 274 | $26,419 | 685 | $10,220 | - | $7,602 101,424 kWh |
$127 274 kW-months/year |
$26,419 685 MMBtu |
$10,220 - % |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | % | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Fuel Oil #2 | Increase in Production | Electricity Usage | Electricity Demand | Fuel Oil #2 | Increase in Production |