IAC logo
IAC Recommendation Types
Sponsored by:
DOE MESC
IAC logo
IAC Recommendation Types
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The Assessment Recommendation Codes ARC is a system for classifying recommendations. [Manual]
Reset
TOP ARC Description Recommendations Reccs Recommended $ Savings Average Payback (yrs) Implementation Rate Imp Rate
back 2.xxxx 2.xxxx ENERGY MANAGEMENT 144,073 $2,058,442,680 1.8 51.0%
back 2.1xxx 2.1xxx Combustion Systems 8,343 $238,311,094 1.5 47.2%
back 2.13xx 2.13xx FUEL SWITCHING 2,232 $108,341,781 2.1 28.0%
2.133x 2.133x Alternate Fuel 360 $60,120,823 2.0 33.5%
2.1331 2.1331 BURN A LESS EXPENSIVE GRADE OF FUEL 158 $15,485,887 1.7 33.8%
2.1332 2.1332 CONVERT COMBUSTION EQUIPMENT TO BURN NATURAL GAS 104 $8,878,611 2.5 37.4%
2.1333 2.1333 CONVERT COMBUSTION EQUIPMENT TO BURN OIL 19 $795,844 0.8 31.6%
2.1335 2.1335 REPLACE GASOLINE WITH DIESEL, LPG, OR NATURAL GAS 14 $608,565 1.9 21.4%
2.1336 2.1336 INSTALL EQUIPMENT TO UTILIZE WASTE FUEL 64 $34,350,565 2.5 28.8%