IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

161,976

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
KS2437 # 06 Y:2024 06 2024 USE SOLAR HEAT TO MAKE ELECTRICTY $47,984 $340,586 n/a
KS2437 # 05 Y:2024 05 2024 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $18,870 $69,278 n/a
KS2437 # 02 Y:2024 02 2024 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,218 $60 n/a
KS2437 # 04 Y:2024 04 2024 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $22,668 $1,600 n/a
KS2437 # 08 Y:2024 08 2024 INSTALL / REPAIR INSULATION ON STEAM LINES $1,546 $4,072 n/a
KS2437 # 01 Y:2024 01 2024 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,199 $5,960 n/a
KS2437 # 07 Y:2024 07 2024 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $8,975 $88,610 n/a
KS2437 # 09 Y:2024 09 2024 USE WASTE HEAT WITH A CLOSED-CYCLE GAS TURBINE-GENERATOR SET TO COGENERATE ELECTRICITY AND HEAT $65,208 $627,000 n/a
KS2437 # 03 Y:2024 03 2024 RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER $771 $2,184 n/a
DL0249 # 07 Y:2025 07 2025 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $7,174 $15,000 n/a
DL0249 # 04 Y:2025 04 2025 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,102 $10,000 n/a
DL0249 # 05 Y:2025 05 2025 RECOVER WASTE HEAT FROM EQUIPMENT $6,172 $13,000 n/a
DL0249 # 08 Y:2025 08 2025 REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES $5,230 $38,000 n/a
DL0249 # 01 Y:2025 01 2025 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $43,100 $30,000 n/a
DL0249 # 06 Y:2025 06 2025 INSULATE BARE EQUIPMENT $35,225 $8,950 n/a
DL0249 # 02 Y:2025 02 2025 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $17,975 $20,000 n/a
DL0249 # 03 Y:2025 03 2025 INSTALL / REPAIR INSULATION ON STEAM LINES $2,075 $1,777 n/a
LE0589 # 06 Y:2025 06 2025 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,173 $4,403 n/a
LE0589 # 04 Y:2025 04 2025 INSTALL OCCUPANCY SENSORS $651 $1,275 n/a
LE0589 # 05 Y:2025 05 2025 PREHEAT COMBUSTION AIR WITH WASTE HEAT $1,588 $5,000 n/a
LE0589 # 07 Y:2025 07 2025 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $4,206 $19,974 n/a
LE0589 # 02 Y:2025 02 2025 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,428 $3,300 n/a
LE0589 # 01 Y:2025 01 2025 INSTALL BACK-UP EQUIPMENT $125,769 $50,000 n/a
LE0589 # 03 Y:2025 03 2025 INSTALL TIMERS AND/OR THERMOSTATS $1,179 $800 n/a
IP0203 # 01 Y:2024 01 2024 USE AUTOMATIC FLOW CONTROL $56,666 $700 n/a