IAC logo
IAC Assessment: AS0352
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: AS0352
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Arizona State University
Assessment Year 2003
Principal Product Molded Urethane Products
NAICS 326199 - All Other Plastics Product Manufacturing
SIC 3089 - Plastics Products, Nec
Sales $10,000,000-$50,000,000
# of Employees 87
Plant Area (Sq.Ft.) 30,000
Annual Production 750,000 Pieces
Production Hrs. Annual 2,117
Location (State) NV
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $49,915 673,855 kWh $0.07
Electricity Demand $3,866 2,983 kW-months/year $1.30
Electricity Fees $15,233 - $ -
Natural Gas $7,685 1,016 MMBtu $7.56
TOTAL ENERGY COSTS $79,193
RECOMMENDED SAVINGS* $52,030 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $45,978
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Administrative Changes Increase in Production Electricity Usage Electricity Demand Administrative Changes Increase in Production
$ kWh $ kW-months/year $ $ $ %
01: 2.7145 INSTALL SKYLIGHTS Savings:
$1,977
Cost:
$4,374
$1,977 25,715 - - - - - - $1,977
25,715
kWh
-
-
kW-months/year
-
-
$
-
-
%
02: 2.7232 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL Savings:
$402
Cost:
$1,000
$396 5,152 $6 18 - - - - $396
5,152
kWh
$6
18
kW-months/year
-
-
$
-
-
%
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$3,619
Cost:
$120
$3,498 45,489 $121 258 - - - - $3,498
45,489
kWh
$121
258
kW-months/year
-
-
$
-
-
%
04: 2.7234 USE HEAT PUMP FOR SPACE CONDITIONING Savings:
$4,075
Cost:
$700
$4,041 52,560 $34 72 - - - - $4,041
52,560
kWh
$34
72
kW-months/year
-
-
$
-
-
%
05: 2.7221 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA Savings:
$194
Cost:
-
$189 2,465 $5 16 - - - - $189
2,465
kWh
$5
16
kW-months/year
-
-
$
-
-
%
06: 4.111 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK Savings:
$29,631
Cost:
$1,380
- - - - - - $29,631 - -
-
kWh
-
-
kW-months/year
-
-
$
$29,631
-
%
07: 4.521 CLEAR AND RENT EXISTING SPACE Savings:
$12,132
Cost:
$9,260
- - - - $12,132 - - - -
-
kWh
-
-
kW-months/year
$12,132
-
$
-
-
%
TOTAL RECOMMENDED Savings:
$52,030
Cost:
$16,834
$10,101 131,381 $166 364 $12,132 - $29,631 - $10,101
131,381
kWh
$166
364
kW-months/year
$12,132
-
$
$29,631
-
%
TOTAL IMPLEMENTED Savings:
$45,978
Cost:
$11,760
$4,083 53,106 $132 292 $12,132 - $29,631 - $4,083
53,106
kWh
$132
292
kW-months/year
$12,132
-
$
$29,631
-
%
Savings
Cost
$ kWh $ kW-months/year $ $ $ %
Electricity Usage Electricity Demand Administrative Changes Increase in Production Electricity Usage Electricity Demand Administrative Changes Increase in Production