IAC logo
IAC Assessment: AS0375
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: AS0375
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Arizona State University
Assessment Year 2004
Principal Product Aircraft Parts and Auxiliary Equipment
NAICS 336413 - Other Aircraft Parts and Auxiliary Equipment Manufacturing
SIC 3728 - Aircraft Parts And Equipment, Nec
Sales $10,000,000-$50,000,000
# of Employees 90
Plant Area (Sq.Ft.) 34,100
Annual Production 40,000 Pieces
Production Hrs. Annual 4,042
Location (State) AZ
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $95,123 1,152,319 kWh $0.08
Electricity Demand $7,821 4,831 kW-months/year $1.62
Electricity Fees $6,581 - $ -
Natural Gas $19,385 2,378 MMBtu $8.15
TOTAL ENERGY COSTS $128,910
RECOMMENDED SAVINGS* $16,917 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $1,768
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Usage Electricity Demand
$ kWh $ kW-months/year
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$6,472
Cost:
$11,485
$2,319 32,036 $4,153 819 $2,319
32,036
kWh
$4,153
819
kW-months/year
02: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$880
Cost:
$900
$880 12,150 - - $880
12,150
kWh
-
-
kW-months/year
03: 2.7232 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL Savings:
$7,797
Cost:
$26,415
$6,847 94,583 $950 224 $6,847
94,583
kWh
$950
224
kW-months/year
04: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$468
Cost:
$737
$468 6,466 - - $468
6,466
kWh
-
-
kW-months/year
05: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$168
Cost:
$60
$139 1,923 $29 6 $139
1,923
kWh
$29
6
kW-months/year
06: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$1,132
Cost:
$30
$937 12,943 $195 38 $937
12,943
kWh
$195
38
kW-months/year
TOTAL RECOMMENDED Savings:
$16,917
Cost:
$39,627
$11,590 160,101 $5,327 1,087 $11,590
160,101
kWh
$5,327
1,087
kW-months/year
TOTAL IMPLEMENTED Savings:
$1,768
Cost:
$827
$1,544 21,332 $224 44 $1,544
21,332
kWh
$224
44
kW-months/year
Savings
Cost
$ kWh $ kW-months/year
Electricity Usage Electricity Demand Electricity Usage Electricity Demand