IAC logo
IAC Assessment: AS0392
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: AS0392
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Arizona State University
Assessment Year 2005
Principal Product Paperboard
NAICS 322211 - Corrugated and Solid Fiber Box Manufacturing
SIC 2653 - Corrugated And Solid Fiber Boxes
Sales $10,000,000-$50,000,000
# of Employees 130
Plant Area (Sq.Ft.) 168,000
Annual Production 850,000 Thousand Feet
Production Hrs. Annual 6,576
Location (State) AZ
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $197,365 3,985,401 kWh $0.05
Electricity Demand $13,765 5,754 kW-months/year $2.39
Electricity Fees $45,401 - $ -
Natural Gas $219,919 48,247 MMBtu $4.56
TOTAL ENERGY COSTS $481,162
RECOMMENDED SAVINGS* $2,022,390 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Increase in Production Electricity Usage Electricity Demand Natural Gas Increase in Production
$ kWh $ kW-months/year $ MMBtu $ %
01: 4.4210 MODIFY CURRENT INCENTIVE PROGRAM Savings:
$1,000,000
Cost:
$891,000
- - - - - - $1,000,000 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$1,000,000
-
%
02: 3.1163 USE PLASTIC PALLETS INSTEAD OF WOOD Savings:
$1,000,000
Cost:
$217,560
- - - - - - $1,000,000 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$1,000,000
-
%
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$10,212
Cost:
$16,893
$9,364 186,167 $848 353 - - - - $9,364
186,167
kWh
$848
353
kW-months/year
-
-
MMBtu
-
-
%
04: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$3,774
Cost:
$4,055
$3,467 70,039 $307 11 - - - - $3,467
70,039
kWh
$307
11
kW-months/year
-
-
MMBtu
-
-
%
05: 2.2511 INSULATE BARE EQUIPMENT Savings:
$2,942
Cost:
$650
- - - - $2,942 645 - - -
-
kWh
-
-
kW-months/year
$2,942
645
MMBtu
-
-
%
06: 2.2441 PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT Savings:
$773
Cost:
$700
- - - - $773 169 - - -
-
kWh
-
-
kW-months/year
$773
169
MMBtu
-
-
%
07: 2.4226 USE / PURCHASE OPTIMUM SIZED COMPRESSOR Savings:
$4,689
Cost:
$6,000
$4,429 65,949 $260 8 - - - - $4,429
65,949
kWh
$260
8
kW-months/year
-
-
MMBtu
-
-
%
TOTAL RECOMMENDED Savings:
$2,022,390
Cost:
$1,136,858
$17,260 322,155 $1,415 372 $3,715 814 $2,000,000 - $17,260
322,155
kWh
$1,415
372
kW-months/year
$3,715
814
MMBtu
$2,000,000
-
%
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
%
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ %
Electricity Usage Electricity Demand Natural Gas Increase in Production Electricity Usage Electricity Demand Natural Gas Increase in Production