Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Arizona State University |
---|---|
Assessment Year | 2005 |
Principal Product | Processed cheese |
NAICS | 311513 - Cheese Manufacturing |
SIC | 2022 - Cheese, Natural And Processed |
Sales | $100,000,000-$500,000,000 |
# of Employees | 120 |
Plant Area (Sq.Ft.) | 40,000 |
Annual Production | 80,000,000 Pounds |
Production Hrs. Annual | 8,520 |
Location (State) | AZ |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $574,090 | 10,735,600 | kWh | $0.05 |
Electricity Demand | $30,327 | 11,987 | kW-months/year | $2.53 |
Natural Gas | $1,215,644 | 192,978 | MMBtu | $6.30 |
TOTAL ENERGY COSTS | $1,834,661 | |||
RECOMMENDED SAVINGS* | $536,781 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $443,040 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Administrative Changes | Electricity Usage | Electricity Demand | Natural Gas | Administrative Changes | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS |
Savings: $1,769 Cost: $3,632 |
$1,567 | 27,832 | $202 | 80 | - | - | - | - |
$1,567 27,832 kWh |
$202 80 kW-months/year |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.1213 DIRECT WARMEST AIR TO COMBUSTION INTAKE |
Savings: $18,219 Cost: $1,000 |
- | - | - | - | $18,219 | 3,198 | - | - |
- - kWh |
- - kW-months/year |
$18,219 3,198 MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES |
Savings: $1,961 Cost: $321 |
- | - | - | - | $1,961 | 309 | - | - |
- - kWh |
- - kW-months/year |
$1,961 309 MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.2192 USE HEAT EXCHANGE FLUIDS INSTEAD OF STEAM IN PIPELINE TRACING SYSTEMS |
Savings: $71,792 Cost: $33,000 |
- | - | - | - | $71,792 | 12,595 | - | - |
- - kWh |
- - kW-months/year |
$71,792 12,595 MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 4.441 INSTALL AUTOMATIC PACKING EQUIPMENT |
Savings: $443,040 Cost: $453,047 |
- | - | - | - | - | - | $443,040 | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
$443,040 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $536,781 Cost: $491,000 |
$1,567 | 27,832 | $202 | 80 | $91,972 | 16,102 | $443,040 | - | $1,567 27,832 kWh |
$202 80 kW-months/year |
$91,972 16,102 MMBtu |
$443,040 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $443,040 Cost: $453,047 |
- | - | - | - | - | - | $443,040 | - | - - kWh |
- - kW-months/year |
- - MMBtu |
$443,040 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Administrative Changes | Electricity Usage | Electricity Demand | Natural Gas | Administrative Changes |