IAC logo
IAC Assessment: AS0406
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: AS0406
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Arizona State University
Assessment Year 2005
Principal Product gypsum board products
NAICS 327420 - Gypsum Product Manufacturing
SIC 3275 - Gypsum Products
Sales $100,000,000-$500,000,000
# of Employees 130
Plant Area (Sq.Ft.) 600,000
Annual Production 1,300,000 Thousand Feet
Production Hrs. Annual 6,616
Location (State) NV
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $869,735 17,642,832 kWh $0.05
Electricity Demand $107,159 27,816 kW-months/year $3.85
Natural Gas $929,178 96,737 MMBtu $9.61
TOTAL ENERGY COSTS $1,906,072
RECOMMENDED SAVINGS* $520,926 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas
$ kWh $ kW-months/year $ MMBtu
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$393,520
Cost:
$200,000
- - - - $393,520 42,681 -
-
kWh
-
-
kW-months/year
$393,520
42,681
MMBtu
02: 2.4224 UPGRADE CONTROLS ON COMPRESSORS Savings:
$46,489
Cost:
$10,000
$42,036 854,396 $4,453 1,157 - - $42,036
854,396
kWh
$4,453
1,157
kW-months/year
-
-
MMBtu
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$28,210
Cost:
$1,000
$25,516 518,617 $2,694 700 - - $25,516
518,617
kWh
$2,694
700
kW-months/year
-
-
MMBtu
04: 2.4226 USE / PURCHASE OPTIMUM SIZED COMPRESSOR Savings:
$21,234
Cost:
$10,000
$19,214 390,534 $2,020 524 - - $19,214
390,534
kWh
$2,020
524
kW-months/year
-
-
MMBtu
05: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES Savings:
$20,625
Cost:
$11,478
- - - - $20,625 2,237 -
-
kWh
-
-
kW-months/year
$20,625
2,237
MMBtu
06: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$10,848
Cost:
$1,000
$9,994 203,140 $854 222 - - $9,994
203,140
kWh
$854
222
kW-months/year
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$520,926
Cost:
$233,478
$96,760 1,966,687 $10,021 2,603 $414,145 44,918 $96,760
1,966,687
kWh
$10,021
2,603
kW-months/year
$414,145
44,918
MMBtu
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ MMBtu
Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas