Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Arizona State University |
---|---|
Assessment Year | 2006 |
Principal Product | Pyrotechnique devices |
NAICS | 325998 - All Other Miscellaneous Chemical Product and Preparation Manufacturing |
SIC | 3489 - Ordnance And Accessories, Nec |
Sales | $50,000,000-$100,000,000 |
# of Employees | 235 |
Plant Area (Sq.Ft.) | 100,000 |
Annual Production | 10 Units |
Production Hrs. Annual | 3,120 |
Location (State) | AZ |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $103,702 | 3,814,704 | kWh | $0.03 |
TOTAL ENERGY COSTS | $103,702 | |||
RECOMMENDED SAVINGS* | $26,444 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $22,111 |
#|Description |
Savings Cost |
Status | Electricity Usage | Personnel Changes | Increase in Production | Electricity Usage | Personnel Changes | Increase in Production | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | $ | $ | % | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 4.131 MODIFY PROCESS TO REDUCE MATERIAL USE/COST |
Savings: $19,739 Cost: $5,500 |
- | - | $8,509 | - | $11,230 | - |
- - kWh |
$8,509 - $ |
$11,230 - % |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.7121 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT |
Savings: $2,463 Cost: $24,000 |
$2,463 | 90,540 | - | - | - | - |
$2,463 90,540 kWh |
- - $ |
- - % |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $2,372 Cost: $1,000 |
$2,372 | 87,232 | - | - | - | - |
$2,372 87,232 kWh |
- - $ |
- - % |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $928 Cost: $3,000 |
$928 | 34,073 | - | - | - | - |
$928 34,073 kWh |
- - $ |
- - % |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $810 Cost: $12,174 |
$810 | 5,104 | - | - | - | - |
$810 5,104 kWh |
- - $ |
- - % |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.9112 USE SOLAR HEAT TO HEAT WATER |
Savings: $132 Cost: $2,800 |
$132 | 4,801 | - | - | - | - |
$132 4,801 kWh |
- - $ |
- - % |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $26,444 Cost: $48,474 |
$6,705 | 221,750 | $8,509 | - | $11,230 | - | $6,705 221,750 kWh |
$8,509 - $ |
$11,230 - % |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $22,111 Cost: $6,500 |
$2,372 | 87,232 | $8,509 | - | $11,230 | - | $2,372 87,232 kWh |
$8,509 - $ |
$11,230 - % |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | $ | $ | % | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Personnel Changes | Increase in Production | Electricity Usage | Personnel Changes | Increase in Production |