IAC logo
IAC Assessment: AS0418
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: AS0418
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Arizona State University
Assessment Year 2006
Principal Product Lithographic prints
NAICS 323111 - Commercial Printing (except Screen and Books)
SIC 2752 - Commercial Printing, Lithographic
Sales $10,000,000-$50,000,000
# of Employees 130
Plant Area (Sq.Ft.) 43,000
Annual Production 3,000,000 Pieces
Production Hrs. Annual 6,096
Location (State) NV
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $191,230 2,454,010 kWh $0.08
Electricity Demand $28,552 5,785 kW-months/year $4.94
TOTAL ENERGY COSTS $219,782
RECOMMENDED SAVINGS* $64,453 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand One-time Revenue or Avoided Cost Electricity Usage Electricity Demand One-time Revenue or Avoided Cost
$ kWh $ kW-months/year $ $
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$21,182
Cost:
$15,913
$19,126 229,257 $2,056 441 - - $19,126
229,257
kWh
$2,056
441
kW-months/year
-
-
$
02: 4.4250 ELIMINATE/REDUCE REDUNDANT INSPECTIONS Savings:
$15,053
Cost:
-
- - - - $15,053 - -
-
kWh
-
-
kW-months/year
$15,053
-
$
03: 2.7232 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL Savings:
$12,196
Cost:
-
$11,288 152,339 $908 24 - - $11,288
152,339
kWh
$908
24
kW-months/year
-
-
$
04: 2.4223 INSTALL DIRECT ACTING UNITS IN PLACE OF COMPRESSED AIR PRESSURE SYSTEM IN SAFETY SYSTEM Savings:
$6,612
Cost:
$550
$5,833 74,880 $779 13 - - $5,833
74,880
kWh
$779
13
kW-months/year
-
-
$
05: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$4,272
Cost:
$1,000
- - $4,272 48,495 - - -
-
kWh
$4,272
48,495
kW-months/year
-
-
$
06: 2.4323 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT Savings:
$3,394
Cost:
$1,900
$3,001 38,520 $393 7 - - $3,001
38,520
kWh
$393
7
kW-months/year
-
-
$
07: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$1,386
Cost:
$3,000
$1,225 15,731 $161 3 - - $1,225
15,731
kWh
$161
3
kW-months/year
-
-
$
08: 2.9112 USE SOLAR HEAT TO HEAT WATER Savings:
$358
Cost:
$2,800
$358 4,801 - 1 - - $358
4,801
kWh
-
1
kW-months/year
-
-
$
TOTAL RECOMMENDED Savings:
$64,453
Cost:
$25,163
$40,831 515,528 $8,569 48,984 $15,053 - $40,831
515,528
kWh
$8,569
48,984
kW-months/year
$15,053
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - -
-
kWh
-
-
kW-months/year
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ $
Electricity Usage Electricity Demand One-time Revenue or Avoided Cost Electricity Usage Electricity Demand One-time Revenue or Avoided Cost