IAC logo
IAC Assessment: AS0420
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: AS0420
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Arizona State University
Assessment Year 2006
Principal Product Optical scanning
NAICS 334118 - Computer Terminal and Other Computer Peripheral Equipment Manufacturing
SIC 3577 - Computer Peripheral Equipment, Nec
Sales $5,000,000-$10,000,000
# of Employees 73
Plant Area (Sq.Ft.) 42,000
Annual Production 100,000 Pieces
Production Hrs. Annual 5,334
Location (State) AZ
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $118,000 1,590,093 kWh $0.07
Electricity Demand $5,449 3,619 kW-months/year $1.51
TOTAL ENERGY COSTS $123,449
RECOMMENDED SAVINGS* $10,861 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $4,582
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Usage Electricity Demand
$ kWh $ kW-months/year
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$2,359
Cost:
$18,572
$2,070 29,248 $289 94 $2,070
29,248
kWh
$289
94
kW-months/year
02: 2.4224 UPGRADE CONTROLS ON COMPRESSORS Savings:
$2,260
Cost:
$10,000
$2,093 29,560 $167 9 $2,093
29,560
kWh
$167
9
kW-months/year
03: 2.4323 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT Savings:
$2,254
Cost:
$3,300
$2,088 29,491 $166 19 $2,088
29,491
kWh
$166
19
kW-months/year
04: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$1,765
Cost:
$1,000
$1,633 23,070 $132 7 $1,633
23,070
kWh
$132
7
kW-months/year
05: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$1,338
Cost:
$5,000
$1,250 17,661 $88 5 $1,250
17,661
kWh
$88
5
kW-months/year
06: 2.7232 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL Savings:
$885
Cost:
$13,820
$818 11,553 $67 6 $818
11,553
kWh
$67
6
kW-months/year
TOTAL RECOMMENDED Savings:
$10,861
Cost:
$51,692
$9,952 140,583 $909 140 $9,952
140,583
kWh
$909
140
kW-months/year
TOTAL IMPLEMENTED Savings:
$4,582
Cost:
$37,392
$4,138 58,462 $444 105 $4,138
58,462
kWh
$444
105
kW-months/year
Savings
Cost
$ kWh $ kW-months/year
Electricity Usage Electricity Demand Electricity Usage Electricity Demand