IAC Assessment: AS0435
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: AS0435
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Arizona State University
Assessment Year 2017
Principal Product Printing services
NAICS 323111 - Commercial Printing (except Screen and Books)
SIC 2752 - Commercial Printing, Lithographic
Sales $10,000,000-$50,000,000
# of Employees 70
Plant Area (Sq.Ft.) 25,000
Annual Production 100,000 Pieces
Production Hrs. Annual 3,302
Location (State) AZ
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $99,902 1,212,320 kWh $0.08
Electricity Demand $79,486 5,012 kW-months/year $15.86
Electricity Fees $8,788 - $ -
TOTAL ENERGY COSTS $188,176
RECOMMENDED SAVINGS* $39,371 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Water Usage Ancillary Material Cost Increase in Production Electricity Usage Electricity Demand Water Usage Ancillary Material Cost Increase in Production
$ kWh $ kW-months/year $ Tgal $ $ $ %
01: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$26,295
Cost:
$200
$15,472 187,770 $10,823 682 - - - - - - $15,472
187,770
kWh
$10,823
682
kW-months/year
-
-
Tgal
-
-
$
-
-
%
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$7,087
Cost:
$5,774
$4,169 50,600 $2,918 184 - - - - - - $4,169
50,600
kWh
$2,918
184
kW-months/year
-
-
Tgal
-
-
$
-
-
%
03: 3.5316 CONTRACT A WOOD PALLET RECYCLING COMPANY Savings:
$3,510
Cost:
$60
- - - - - - $3,510 - - - -
-
kWh
-
-
kW-months/year
-
-
Tgal
$3,510
-
$
-
-
%
04: 3.4151 MINIMIZE WATER USAGE Savings:
$912
Cost:
$2,243
- - - - $912 56,376 - - - - -
-
kWh
-
-
kW-months/year
$912
56,376
Tgal
-
-
$
-
-
%
05: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$787
Cost:
$60
$422 5,118 $365 23 - - - - - - $422
5,118
kWh
$365
23
kW-months/year
-
-
Tgal
-
-
$
-
-
%
06: 4.652 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES Savings:
$780
Cost:
$325
$113 1,369 $73 5 - - - - $594 - $113
1,369
kWh
$73
5
kW-months/year
-
-
Tgal
-
-
$
$594
-
%
TOTAL RECOMMENDED Savings:
$39,371
Cost:
$8,662
$20,176 244,857 $14,179 894 $912 56,376 $3,510 - $594 - $20,176
244,857
kWh
$14,179
894
kW-months/year
$912
56,376
Tgal
$3,510
-
$
$594
-
%
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
Tgal
-
-
$
-
-
%
Savings
Cost
$ kWh $ kW-months/year $ Tgal $ $ $ %
Electricity Usage Electricity Demand Water Usage Ancillary Material Cost Increase in Production Electricity Usage Electricity Demand Water Usage Ancillary Material Cost Increase in Production