IAC logo
IAC Assessment: AS0439
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: AS0439
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Arizona State University
Assessment Year 2017
Principal Product Electronic components
NAICS 334418 - Printed Circuit Assembly (Electronic Assembly) Manufacturing
SIC 3674 - Semiconductors And Related Devices
Sales $10,000,000-$50,000,000
# of Employees 100
Plant Area (Sq.Ft.) 50,000
Annual Production 100,000 Units
Production Hrs. Annual 4,160
Location (State) AZ
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $120,430 1,856,758 kWh $0.06
Electricity Demand $69,925 4,355 kW-months/year $16.06
Electricity Fees $8,788 - $ -
Natural Gas $33,396 4,000 MMBtu $8.35
TOTAL ENERGY COSTS $240,078
RECOMMENDED SAVINGS* $16,802 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $1,293
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Ancillary Material Cost Electricity Usage Electricity Demand Ancillary Material Cost
$ kWh $ kW-months/year $ $
01: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$629
Cost:
$650
$317 4,662 $312 19 - - $317
4,662
kWh
$312
19
kW-months/year
-
-
$
02: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$14,146
Cost:
$4,770
$11,510 169,272 $2,636 164 - - $11,510
169,272
kWh
$2,636
164
kW-months/year
-
-
$
03: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$1,293
Cost:
$950
$522 7,680 $771 48 - - $522
7,680
kWh
$771
48
kW-months/year
-
-
$
04: 3.7311 MAINTAIN MACHINES TO REDUCE LEAKS Savings:
$734
Cost:
$545
- - - - $734 - -
-
kWh
-
-
kW-months/year
$734
-
$
TOTAL RECOMMENDED Savings:
$16,802
Cost:
$6,915
$12,349 181,614 $3,719 232 $734 - $12,349
181,614
kWh
$3,719
232
kW-months/year
$734
-
$
TOTAL IMPLEMENTED Savings:
$1,293
Cost:
$950
$522 7,680 $771 48 - - $522
7,680
kWh
$771
48
kW-months/year
-
-
$