IAC logo
IAC Assessment: AS0452
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: AS0452
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Arizona State University
Assessment Year 2018
Principal Product Marketing Material, Commercial Printing
NAICS 323111 - Commercial Printing (except Screen and Books)
SIC 2752 - Commercial Printing, Lithographic
Sales $5,000,000-$10,000,000
# of Employees 100
Plant Area (Sq.Ft.) 50,000
Annual Production 1,000 Units
Production Hrs. Annual 3,060
Location (State) AZ
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $86,897 945,000 kWh $0.09
Electricity Demand $19,983 3,278 kW-months/year $6.10
Electricity Fees $475 - $ -
TOTAL ENERGY COSTS $107,355
RECOMMENDED SAVINGS* $18,087 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $15,516
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Usage Electricity Demand
$ kWh $ kW-months/year
01: 2.7232 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL Savings:
$7,381
Cost:
$29,400
$5,803 63,077 $1,578 259 $5,803
63,077
kWh
$1,578
259
kW-months/year
02: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$4,940
Cost:
$20
$4,543 47,254 $397 65 $4,543
47,254
kWh
$397
65
kW-months/year
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$3,195
Cost:
$8,487
$2,472 27,471 $723 119 $2,472
27,471
kWh
$723
119
kW-months/year
04: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$1,822
Cost:
$2,775
$1,822 19,803 - - $1,822
19,803
kWh
-
-
kW-months/year
05: 2.6232 INSTALL SET-BACK TIMERS Savings:
$749
Cost:
$675
$749 8,143 - - $749
8,143
kWh
-
-
kW-months/year
TOTAL RECOMMENDED Savings:
$18,087
Cost:
$41,357
$15,389 165,748 $2,698 443 $15,389
165,748
kWh
$2,698
443
kW-months/year
TOTAL IMPLEMENTED Savings:
$15,516
Cost:
$37,907
$12,818 137,802 $2,698 443 $12,818
137,802
kWh
$2,698
443
kW-months/year
Savings
Cost
$ kWh $ kW-months/year