IAC Assessment: AS0461
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: AS0461
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Arizona State University
Assessment Year 2018
Principal Product aluminum milling cutting
NAICS 332710 - Machine Shops
SIC 3599 - Industrial Machinery, Nec
Sales $10,000,000-$50,000,000
# of Employees 130
Plant Area (Sq.Ft.) 40,000
Annual Production 4,000,000 Units
Production Hrs. Annual 4,264
Location (State) AZ
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $107,314 1,343,104 kWh $0.08
Electricity Demand $18,386 3,962 kW-months/year $4.64
Electricity Fees $11,360 - $ -
TOTAL ENERGY COSTS $137,060
RECOMMENDED SAVINGS* $25,069 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $11,080
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Ancillary Material Cost Electricity Usage Electricity Demand Ancillary Material Cost
$ kWh $ kW-months/year $ $
01: 3.5311 RECOVER AND REUSE WASTE MATERIAL Savings:
$11,063
Cost:
-
- - - - $11,063 - -
-
kWh
-
-
kW-months/year
$11,063
-
$
02: 2.7232 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL Savings:
$6,390
Cost:
$30,436
$4,806 60,154 $1,584 341 - - $4,806
60,154
kWh
$1,584
341
kW-months/year
-
-
$
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$4,690
Cost:
$6,300
$4,020 50,315 $670 145 - - $4,020
50,315
kWh
$670
145
kW-months/year
-
-
$
04: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$2,926
Cost:
$1,565
$2,926 36,628 - - - - $2,926
36,628
kWh
-
-
kW-months/year
-
-
$
TOTAL RECOMMENDED Savings:
$25,069
Cost:
$38,301
$11,752 147,097 $2,254 486 $11,063 - $11,752
147,097
kWh
$2,254
486
kW-months/year
$11,063
-
$
TOTAL IMPLEMENTED Savings:
$11,080
Cost:
$36,736
$8,826 110,469 $2,254 486 - - $8,826
110,469
kWh
$2,254
486
kW-months/year
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ $
Electricity Usage Electricity Demand Ancillary Material Cost Electricity Usage Electricity Demand Ancillary Material Cost