IAC Center Arizona State University
Assessment Year 2018
Principal Product aluminum milling cutting
NAICS 332710 - Machine Shops
SIC 3599 - Industrial Machinery, Nec
Sales $33,000,000
# of Employees 130
Plant Area (Sq.Ft.) 40,000
Annual Production 4,000,000 not found
Production Hrs. Annual 4,264
Location (State) AZ
Source Yearly Cost Usage
Electricity Usage $107,314 1,343,104
Electricity Demand $18,386 3,962
Electricity Fees $11,360 -
TOTAL ENERGY COSTS $137,060
RECOMMENDED SAVINGS* $25,069 *Non-energy impacts
included in savings.
IMPLEMENTED SAVINGS* -
#|Description Status Electricity Usage Electricity Demand Ancillary Material Cost Electricity Usage Electricity Demand Ancillary Material Cost
$ kWh $ kW/month $ $
01: 3.5311 RECOVER AND REUSE WASTE MATERIAL Savings:
$11,063
Cost:
-
- - - - $11,063 - -
-
kWh
-
-
kW/month
$11,063
-
$
02: 2.7232 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL Savings:
$6,390
Cost:
$30,436
$4,806 60,154 $1,584 341 - - $4,806
60,154
kWh
$1,584
341
kW/month
-
-
$
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$4,690
Cost:
$6,300
$4,020 50,315 $670 145 - - $4,020
50,315
kWh
$670
145
kW/month
-
-
$
04: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$2,926
Cost:
$1,565
$2,926 36,628 - - - - $2,926
36,628
kWh
-
-
kW/month
-
-
$
TOTAL RECOMMENDED Savings:
$25,069
Cost:
$38,301
$11,752 147,097 $2,254 486 $11,063 - $11,752
147,097
kWh
$2,254
486
kW/month
$11,063
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - -
-
kWh
-
-
kW/month
-
-
$
$ kWh $ kW/month $ $
Electricity Usage Electricity Demand Ancillary Material Cost Electricity Usage Electricity Demand Ancillary Material Cost
Back to Top