IAC logo
IAC Assessment: AS0466
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: AS0466
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Arizona State University
Assessment Year 2019
Principal Product Commercial paper rolls
NAICS 322121 - Paper (except Newsprint) Mills
SIC 2621 - Paper Mills
Sales $50,000,000-$100,000,000
# of Employees 188
Plant Area (Sq.Ft.) 243,000
Annual Production 8,600,000 Units
Production Hrs. Annual 6,096
Location (State) AZ
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $289,413 4,255,090 kWh $0.07
Electricity Demand $170,884 11,131 kW-months/year $15.35
Electricity Fees $66,261 - $ -
TOTAL ENERGY COSTS $526,558
RECOMMENDED SAVINGS* $118,207 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $118,207
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Administrative Changes Electricity Usage Electricity Demand Administrative Changes
$ kWh $ kW-months/year $ $
01: 2.8112 COMBINE UTILITY METERS Savings:
$60,673
Cost:
$416
- - - - $60,673 - -
-
kWh
-
-
kW-months/year
$60,673
-
$
02: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$36,247
Cost:
$79,305
$25,957 370,808 $10,290 670 - - $25,957
370,808
kWh
$10,290
670
kW-months/year
-
-
$
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$5,685
Cost:
$900
$3,971 56,729 $1,714 112 - - $3,971
56,729
kWh
$1,714
112
kW-months/year
-
-
$
04: 2.4224 UPGRADE CONTROLS ON COMPRESSORS Savings:
$5,468
Cost:
$17,280
$3,819 54,559 $1,649 107 - - $3,819
54,559
kWh
$1,649
107
kW-months/year
-
-
$
05: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$5,430
Cost:
$2,739
$4,752 67,885 $678 44 - - $4,752
67,885
kWh
$678
44
kW-months/year
-
-
$
06: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$4,704
Cost:
$500
$3,286 46,934 $1,418 92 - - $3,286
46,934
kWh
$1,418
92
kW-months/year
-
-
$
TOTAL RECOMMENDED Savings:
$118,207
Cost:
$101,140
$41,785 596,915 $15,749 1,026 $60,673 - $41,785
596,915
kWh
$15,749
1,026
kW-months/year
$60,673
-
$
TOTAL IMPLEMENTED Savings:
$118,207
Cost:
$101,140
$41,785 596,915 $15,749 1,026 $60,673 - $41,785
596,915
kWh
$15,749
1,026
kW-months/year
$60,673
-
$
Savings
Cost
$ kWh $ kW-months/year $ $
Electricity Usage Electricity Demand Administrative Changes Electricity Usage Electricity Demand Administrative Changes