IAC logo
IAC Assessment: AS0472
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: AS0472
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Arizona State University
Assessment Year 2019
Principal Product Herbicides and Other Agricultural Chemical Manufacturing
NAICS 325320 - Pesticide and Other Agricultural Chemical Manufacturing
SIC 2879 - Agricultural Chemicals, Nec
Sales $10,000,000-$50,000,000
# of Employees 300
Plant Area (Sq.Ft.) 2,614,000
Annual Production 10,000 Tons
Production Hrs. Annual 7,884
Location (State) AZ
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $153,171 3,354,000 kWh $0.05
Electricity Demand $419,980 25,106 kW-months/year $16.73
Electricity Fees $15,294 - $ -
Natural Gas $197,542 27,586 MMBtu $7.16
TOTAL ENERGY COSTS $785,987
RECOMMENDED SAVINGS* $144,500 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $4,692
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Primary Product Electricity Usage Electricity Demand Primary Product
$ kWh $ kW-months/year $ $
01: 2.9114 USE SOLAR HEAT TO MAKE ELECTRICTY Savings:
$95,737
Cost:
$8,636
$63,766 1,395,321 $31,971 1,911 - - $63,766
1,395,321
kWh
$31,971
1,911
kW-months/year
-
-
$
02: 2.4224 UPGRADE CONTROLS ON COMPRESSORS Savings:
$20,091
Cost:
$41,520
$12,902 282,326 $7,189 430 - - $12,902
282,326
kWh
$7,189
430
kW-months/year
-
-
$
03: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$19,102
Cost:
$53,286
$12,636 276,504 $6,466 386 - - $12,636
276,504
kWh
$6,466
386
kW-months/year
-
-
$
04: 4.621 USE FIXTURES TO REDUCE MACHINE CHANGEOUT TIMES Savings:
$4,878
Cost:
$6,000
$(-216) (-4,724) $(-120) (-7) $5,214 - $(-216)
(-4,724)
kWh
$(-120)
(-7)
kW-months/year
$5,214
-
$
05: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$4,692
Cost:
$770
$3,013 65,933 $1,679 100 - - $3,013
65,933
kWh
$1,679
100
kW-months/year
-
-
$
TOTAL RECOMMENDED Savings:
$144,500
Cost:
$110,212
$92,101 2,015,360 $47,185 2,820 $5,214 - $92,101
2,015,360
kWh
$47,185
2,820
kW-months/year
$5,214
-
$
TOTAL IMPLEMENTED Savings:
$4,692
Cost:
$770
$3,013 65,933 $1,679 100 - - $3,013
65,933
kWh
$1,679
100
kW-months/year
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ $
Electricity Usage Electricity Demand Primary Product Electricity Usage Electricity Demand Primary Product