Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Arizona State University
Assessment Year 2020
Principal Product Asphalt Paving Material
NAICS 324121 - Asphalt Paving Mixture and Block Manufacturing
SIC 2951 - Asphalt Paving Mixtures And Blocks
Sales <$500,000
# of Employees 32
Plant Area (Sq.Ft.) 100,000
Annual Production 1,300,000 Tons
Production Hrs. Annual 3,570
Location (State) AZ
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $525,278 6,378,020 kWh $0.08
Electricity Demand $157,633 34,300 kW-months/year $4.60
Electricity Fees $9,926 - $ -
TOTAL ENERGY COSTS $692,837
RECOMMENDED SAVINGS* $169,586 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $125,419
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Administrative Changes One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Administrative Changes One-time Revenue or Avoided Cost
$ kWh $ kW-months/year $ $ $ $
01: 2.8114 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE Savings:
$118,609
Cost:
$10,790
$111,716 - $10,869 - $(-3,976) - - - $111,716
-
kWh
$10,869
-
kW-months/year
$(-3,976)
-
$
-
-
$
02: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$41,944
Cost:
$27,312
$34,270 428,370 $7,674 1,368 - - - - $34,270
428,370
kWh
$7,674
1,368
kW-months/year
-
-
$
-
-
$
03: 3.4154 ELIMINATE LEAKS IN WATER LINES AND VALVES Savings:
$2,602
Cost:
$272
$2,125 26,558 $477 85 - - - - $2,125
26,558
kWh
$477
85
kW-months/year
-
-
$
-
-
$
04: 2.7272 INSTALL HEAT PIPES / RAISE COOLING SETPOINT Savings:
$2,344
Cost:
$36
$2,299 28,748 $45 8 - - - - $2,299
28,748
kWh
$45
8
kW-months/year
-
-
$
-
-
$
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,864
Cost:
$7,653
$1,892 23,655 $113 20 - - $(-141) - $1,892
23,655
kWh
$113
20
kW-months/year
-
-
$
$(-141)
-
$
06: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$1,828
Cost:
$3,940
$1,368 17,104 $460 82 - - - - $1,368
17,104
kWh
$460
82
kW-months/year
-
-
$
-
-
$
07: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$395
Cost:
$1,840
$395 4,935 - - - - - - $395
4,935
kWh
-
-
kW-months/year
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$169,586
Cost:
$51,843
$154,065 529,370 $19,638 1,563 $(-3,976) - $(-141) - $154,065
529,370
kWh
$19,638
1,563
kW-months/year
$(-3,976)
-
$
$(-141)
-
$
TOTAL IMPLEMENTED Savings:
$125,419
Cost:
$18,751
$118,032 78,961 $11,504 113 $(-3,976) - $(-141) - $118,032
78,961
kWh
$11,504
113
kW-months/year
$(-3,976)
-
$
$(-141)
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ $
Electricity Usage Electricity Demand Administrative Changes One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Administrative Changes One-time Revenue or Avoided Cost