IAC logo
IAC Assessment: AS0491
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: AS0491
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Arizona State University
Assessment Year 2020
Principal Product Treated Wastewater
NAICS 221320 - Sewage Treatment Facilities
SIC 4952 - Sewerage Systems
Sales <$500,000
# of Employees 11
Plant Area (Sq.Ft.) 30,000
Annual Production 2,000,000 Thousand Gallons
Production Hrs. Annual 8,760
Location (State) AZ
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $632,133 9,156,662 kWh $0.07
Electricity Demand $83,560 15,989 kW-months/year $5.23
Electricity Fees $61,539 - $ -
TOTAL ENERGY COSTS $777,232
RECOMMENDED SAVINGS* $266,363 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $180,477
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Electricity Fees One-time Revenue or Avoided Cost
$ kWh $ kW-months/year $ $ $ $
01: 2.4323 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT Savings:
$176,974
Cost:
$3,941
$163,403 2,368,160 $13,571 2,595 - - - - $163,403
2,368,160
kWh
$13,571
2,595
kW-months/year
-
-
$
-
-
$
02: 2.8112 COMBINE UTILITY METERS Savings:
$69,299
Cost:
$735
$107,959 - $(-30,500) - $(-8,160) - - - $107,959
-
kWh
$(-30,500)
-
kW-months/year
$(-8,160)
-
$
-
-
$
03: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$16,587
Cost:
$9,520
$15,066 218,353 $1,521 291 - - - - $15,066
218,353
kWh
$1,521
291
kW-months/year
-
-
$
-
-
$
04: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$1,757
Cost:
$511
$1,757 25,458 - - - - - - $1,757
25,458
kWh
-
-
kW-months/year
-
-
$
-
-
$
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,511
Cost:
$2,230
$1,323 19,167 $136 26 - - $52 - $1,323
19,167
kWh
$136
26
kW-months/year
-
-
$
$52
-
$
06: 2.7272 INSTALL HEAT PIPES / RAISE COOLING SETPOINT Savings:
$235
Cost:
$38
$180 2,606 $55 10 - - - - $180
2,606
kWh
$55
10
kW-months/year
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$266,363
Cost:
$16,975
$289,688 2,633,744 $(-15,217) 2,922 $(-8,160) - $52 - $289,688
2,633,744
kWh
$(-15,217)
2,922
kW-months/year
$(-8,160)
-
$
$52
-
$
TOTAL IMPLEMENTED Savings:
$180,477
Cost:
$6,720
$166,663 2,415,391 $13,762 2,631 - - $52 - $166,663
2,415,391
kWh
$13,762
2,631
kW-months/year
-
-
$
$52
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ $
Electricity Usage Electricity Demand Electricity Fees One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Electricity Fees One-time Revenue or Avoided Cost