IAC logo
IAC Assessment: AS0493
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: AS0493
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Arizona State University
Assessment Year 2020
Principal Product Treated Wastewater
NAICS 221320 - Sewage Treatment Facilities
SIC 4952 - Sewerage Systems
Sales <$500,000
# of Employees 13
Plant Area (Sq.Ft.) 40,000
Annual Production 654,000 Thousand Gallons
Production Hrs. Annual 8,760
Location (State) AZ
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $196,689 2,787,087 kWh $0.07
Electricity Demand $63,432 6,170 kW-months/year $10.28
Electricity Fees $23,511 - $ -
TOTAL ENERGY COSTS $283,632
RECOMMENDED SAVINGS* $47,148 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $47,148
#|Description Savings
Cost
Status Electricity Usage Electricity Demand One-time Revenue or Avoided Cost Electricity Usage Electricity Demand One-time Revenue or Avoided Cost
$ kWh $ kW-months/year $ $
01: 2.8112 COMBINE UTILITY METERS Savings:
$21,443
Cost:
$1,473
$62,685 - $(-42,007) - $765 - $62,685
-
kWh
$(-42,007)
-
kW-months/year
$765
-
$
02: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$13,179
Cost:
$8,066
$10,687 150,514 $2,492 243 - - $10,687
150,514
kWh
$2,492
243
kW-months/year
-
-
$
03: 2.4323 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT Savings:
$9,788
Cost:
$3,941
$8,452 119,048 $1,336 130 - - $8,452
119,048
kWh
$1,336
130
kW-months/year
-
-
$
04: 2.6125 KEEP EQUIPMENT CLEAN Savings:
$1,693
Cost:
$2,174
$1,693 23,848 - - - - $1,693
23,848
kWh
-
-
kW-months/year
-
-
$
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,045
Cost:
$2,451
$894 12,589 $172 17 $(-21) - $894
12,589
kWh
$172
17
kW-months/year
$(-21)
-
$
TOTAL RECOMMENDED Savings:
$47,148
Cost:
$18,105
$84,411 305,999 $(-38,007) 390 $744 - $84,411
305,999
kWh
$(-38,007)
390
kW-months/year
$744
-
$
TOTAL IMPLEMENTED Savings:
$47,148
Cost:
$18,105
$84,411 305,999 $(-38,007) 390 $744 - $84,411
305,999
kWh
$(-38,007)
390
kW-months/year
$744
-
$
Savings
Cost
$ kWh $ kW-months/year $ $
Electricity Usage Electricity Demand One-time Revenue or Avoided Cost Electricity Usage Electricity Demand One-time Revenue or Avoided Cost