IAC Assessment: AS0495
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: AS0495
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Arizona State University
Assessment Year 2020
Principal Product Treated Wastewater
NAICS 221320 - Sewage Treatment Facilities
SIC 4952 - Sewerage Systems
Sales <$500,000
# of Employees 7
Plant Area (Sq.Ft.) 7,700
Annual Production 273,000 Thousand Gallons
Production Hrs. Annual 8,760
Location (State) AZ
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $69,547 1,013,760 kWh $0.07
Electricity Demand $20,471 1,929 kW-months/year $10.61
Electricity Fees $8,543 - $ -
TOTAL ENERGY COSTS $98,561
RECOMMENDED SAVINGS* $40,531 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $26,134
#|Description Savings
Cost
Status Electricity Usage Electricity Demand One-time Revenue or Avoided Cost Electricity Usage Electricity Demand One-time Revenue or Avoided Cost
$ kWh $ kW-months/year $ $
01: 2.4323 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT Savings:
$23,643
Cost:
$3,941
$20,280 289,720 $3,363 317 - - $20,280
289,720
kWh
$3,363
317
kW-months/year
-
-
$
02: 2.9114 USE SOLAR HEAT TO MAKE ELECTRICTY Savings:
$14,397
Cost:
$249,210
$13,666 226,980 $731 70 - - $13,666
226,980
kWh
$731
70
kW-months/year
-
-
$
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,621
Cost:
$908
$1,253 17,897 $263 25 $105 - $1,253
17,897
kWh
$263
25
kW-months/year
$105
-
$
04: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$732
Cost:
$612
$732 10,464 - - - - $732
10,464
kWh
-
-
kW-months/year
-
-
$
05: 2.7272 INSTALL HEAT PIPES / RAISE COOLING SETPOINT Savings:
$138
Cost:
$33
$95 1,356 $43 4 - - $95
1,356
kWh
$43
4
kW-months/year
-
-
$
TOTAL RECOMMENDED Savings:
$40,531
Cost:
$254,704
$36,026 546,417 $4,400 416 $105 - $36,026
546,417
kWh
$4,400
416
kW-months/year
$105
-
$
TOTAL IMPLEMENTED Savings:
$26,134
Cost:
$5,494
$22,360 319,437 $3,669 346 $105 - $22,360
319,437
kWh
$3,669
346
kW-months/year
$105
-
$
Savings
Cost
$ kWh $ kW-months/year $ $
Electricity Usage Electricity Demand One-time Revenue or Avoided Cost Electricity Usage Electricity Demand One-time Revenue or Avoided Cost