Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Arizona State University
Assessment Year 2021
Principal Product Industrial Valves
NAICS 332911 - Industrial Valve Manufacturing
SIC 3491 - Industrial Valves
Sales $10,000,000-$50,000,000
# of Employees 132
Plant Area (Sq.Ft.) 98,000
Annual Production 1,018,931 Units
Production Hrs. Annual 2,340
Location (State) AZ
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $148,845 1,200,283 kWh $0.12
Electricity Demand $13,695 2,232 kW-months/year $6.14
Electricity Fees $22,609 - $ -
TOTAL ENERGY COSTS $185,149
RECOMMENDED SAVINGS* $52,809 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $46,935
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Ancillary Material Cost One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Electricity Fees Ancillary Material Cost One-time Revenue or Avoided Cost
$ kWh $ kW-months/year $ $ $ $ $ $
01: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$24,067
Cost:
$104,184
$19,474 157,046 $4,593 748 - - - - - - $19,474
157,046
kWh
$4,593
748
kW-months/year
-
-
$
-
-
$
-
-
$
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$14,810
Cost:
$9,023
$11,867 95,698 $2,024 330 - - - - $919 - $11,867
95,698
kWh
$2,024
330
kW-months/year
-
-
$
-
-
$
$919
-
$
03: 2.8112 COMBINE UTILITY METERS Savings:
$4,314
Cost:
$200
$62,222 - $(-47,764) - $(-10,144) - - - - - $62,222
-
kWh
$(-47,764)
-
kW-months/year
$(-10,144)
-
$
-
-
$
-
-
$
04: 2.7144 INSTALL SPECTRAL REFLECTORS / DELAMP Savings:
$3,053
Cost:
$678
$2,895 23,343 $46 8 - - - - $112 - $2,895
23,343
kWh
$46
8
kW-months/year
-
-
$
-
-
$
$112
-
$
05: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$2,227
Cost:
$8,870
$1,784 14,390 $443 72 - - - - - - $1,784
14,390
kWh
$443
72
kW-months/year
-
-
$
-
-
$
-
-
$
06: 3.5316 CONTRACT A WOOD PALLET RECYCLING COMPANY Savings:
$1,560
Cost:
$453
- - - - - - $1,560 - - - -
-
kWh
-
-
kW-months/year
-
-
$
$1,560
-
$
-
-
$
07: 2.6211 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES Savings:
$978
Cost:
$315
$909 7,334 $69 11 - - - - - - $909
7,334
kWh
$69
11
kW-months/year
-
-
$
-
-
$
-
-
$
08: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$926
Cost:
$250
$746 6,014 $180 29 - - - - - - $746
6,014
kWh
$180
29
kW-months/year
-
-
$
-
-
$
-
-
$
09: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$722
Cost:
$569
$722 5,830 - - - - - - - - $722
5,830
kWh
-
-
kW-months/year
-
-
$
-
-
$
-
-
$
10: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$152
Cost:
$287
$123 989 $29 5 - - - - - - $123
989
kWh
$29
5
kW-months/year
-
-
$
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$52,809
Cost:
$124,829
$100,742 310,644 $(-40,380) 1,203 $(-10,144) - $1,560 - $1,031 - $100,742
310,644
kWh
$(-40,380)
1,203
kW-months/year
$(-10,144)
-
$
$1,560
-
$
$1,031
-
$
TOTAL IMPLEMENTED Savings:
$46,935
Cost:
$124,176
$38,520 310,644 $7,384 1,203 - - - - $1,031 - $38,520
310,644
kWh
$7,384
1,203
kW-months/year
-
-
$
-
-
$
$1,031
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ $ $ $
Electricity Usage Electricity Demand Electricity Fees Ancillary Material Cost One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Electricity Fees Ancillary Material Cost One-time Revenue or Avoided Cost