IAC Assessment: AS0500
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: AS0500
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Arizona State University
Assessment Year 2021
Principal Product Treated Wastewater
NAICS 221320 - Sewage Treatment Facilities
SIC 4952 - Sewerage Systems
Sales <$500,000
# of Employees 12
Plant Area (Sq.Ft.) 1,307,000
Annual Production 2,920,000 Thousand Gallons
Production Hrs. Annual 8,760
Location (State) AZ
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $393,882 10,612,800 kWh $0.04
Electricity Demand $310,434 18,432 kW-months/year $16.84
Electricity Fees $87,003 - $ -
TOTAL ENERGY COSTS $791,319
RECOMMENDED SAVINGS* $243,519 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $12,498
#|Description Savings
Cost
Status Electricity Usage Electricity Demand One-time Revenue or Avoided Cost Electricity Usage Electricity Demand One-time Revenue or Avoided Cost
$ kWh $ kW-months/year $ $
01: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$231,021
Cost:
$2,706
$149,821 3,745,517 $81,200 4,822 - - $149,821
3,745,517
kWh
$81,200
4,822
kW-months/year
-
-
$
02: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$8,048
Cost:
$811
$5,298 132,442 $2,750 163 - - $5,298
132,442
kWh
$2,750
163
kW-months/year
-
-
$
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$2,453
Cost:
$8,113
$1,769 44,214 $908 54 $(-224) - $1,769
44,214
kWh
$908
54
kW-months/year
$(-224)
-
$
04: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$1,279
Cost:
$1,850
$1,279 31,966 - - - - $1,279
31,966
kWh
-
-
kW-months/year
-
-
$
05: 2.7272 INSTALL HEAT PIPES / RAISE COOLING SETPOINT Savings:
$718
Cost:
$38
$317 7,944 $401 24 - - $317
7,944
kWh
$401
24
kW-months/year
-
-
$
TOTAL RECOMMENDED Savings:
$243,519
Cost:
$13,518
$158,484 3,962,083 $85,259 5,063 $(-224) - $158,484
3,962,083
kWh
$85,259
5,063
kW-months/year
$(-224)
-
$
TOTAL IMPLEMENTED Savings:
$12,498
Cost:
$10,812
$8,663 216,566 $4,059 241 $(-224) - $8,663
216,566
kWh
$4,059
241
kW-months/year
$(-224)
-
$
Savings
Cost
$ kWh $ kW-months/year $ $
Electricity Usage Electricity Demand One-time Revenue or Avoided Cost Electricity Usage Electricity Demand One-time Revenue or Avoided Cost