IAC logo
IAC Assessment: AS0502
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: AS0502
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Arizona State University
Assessment Year 2021
Principal Product Crushing and conveying equipment
NAICS 333922 - Conveyor and Conveying Equipment Manufacturing
SIC 3535 - Conveyors And Conveying Equipment
Sales $10,000,000-$50,000,000
# of Employees 90
Plant Area (Sq.Ft.) 75,000
Annual Production 17,720 Units
Production Hrs. Annual 5,559
Location (State) AZ
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $66,010 1,520,960 kWh $0.04
Electricity Demand $115,296 6,022 kW-months/year $19.15
Electricity Fees $6,921 - $ -
Natural Gas $47,272 7,556 MMBtu $6.26
TOTAL ENERGY COSTS $235,499
RECOMMENDED SAVINGS* $34,977 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $12,623
#|Description Savings
Cost
Status Electricity Usage Electricity Demand One-time Revenue or Avoided Cost Electricity Usage Electricity Demand One-time Revenue or Avoided Cost
$ kWh $ kW-months/year $ $
01: 2.8114 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE Savings:
$12,647
Cost:
$200
$(-7,365) - $20,012 - - - $(-7,365)
-
kWh
$20,012
-
kW-months/year
-
-
$
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$11,703
Cost:
$13,532
$6,141 142,802 $5,646 295 $(-84) - $6,141
142,802
kWh
$5,646
295
kW-months/year
$(-84)
-
$
03: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$8,685
Cost:
$2,400
$5,410 125,807 $3,275 171 - - $5,410
125,807
kWh
$3,275
171
kW-months/year
-
-
$
04: 2.6211 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES Savings:
$672
Cost:
$284
$415 9,647 $257 13 - - $415
9,647
kWh
$257
13
kW-months/year
-
-
$
05: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$393
Cost:
$1,127
$211 4,898 $182 10 - - $211
4,898
kWh
$182
10
kW-months/year
-
-
$
06: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$359
Cost:
$793
$143 3,322 $216 11 - - $143
3,322
kWh
$216
11
kW-months/year
-
-
$
07: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$350
Cost:
$1,131
$350 8,134 - - - - $350
8,134
kWh
-
-
kW-months/year
-
-
$
08: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$168
Cost:
$375
$105 2,430 $63 3 - - $105
2,430
kWh
$63
3
kW-months/year
-
-
$
TOTAL RECOMMENDED Savings:
$34,977
Cost:
$19,842
$5,410 297,040 $29,651 504 $(-84) - $5,410
297,040
kWh
$29,651
504
kW-months/year
$(-84)
-
$
TOTAL IMPLEMENTED Savings:
$12,623
Cost:
$15,827
$6,600 153,452 $6,107 319 $(-84) - $6,600
153,452
kWh
$6,107
319
kW-months/year
$(-84)
-
$
Savings
Cost
$ kWh $ kW-months/year $ $
Electricity Usage Electricity Demand One-time Revenue or Avoided Cost Electricity Usage Electricity Demand One-time Revenue or Avoided Cost