IAC logo
IAC Assessment: AS0508
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: AS0508
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Arizona State University
Assessment Year 2021
Principal Product Potable Water
NAICS 221310 - Water Supply and Irrigation Systems
SIC 4941 - Water Supply
Sales <$500,000
# of Employees 75
Plant Area (Sq.Ft.) 118,718
Annual Production 1,250,000 Thousand Gallons
Production Hrs. Annual 8,760
Location (State) AZ
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $255,604 2,890,792 kWh $0.09
Electricity Demand $48,498 6,040 kW-months/year $8.03
Electricity Fees $384 - $ -
TOTAL ENERGY COSTS $304,486
RECOMMENDED SAVINGS* $102,161 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $22,589
#|Description Savings
Cost
Status Electricity Usage Electricity Demand One-time Revenue or Avoided Cost Electricity Usage Electricity Demand One-time Revenue or Avoided Cost
$ kWh $ kW-months/year $ $
01: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$79,572
Cost:
$28,606
$70,731 803,759 $8,841 1,101 - - $70,731
803,759
kWh
$8,841
1,101
kW-months/year
-
-
$
02: 3.1161 ELIMINATE/REDUCE AN OPERATION Savings:
$20,000
Cost:
$200
- - - - $20,000 - -
-
kWh
-
-
kW-months/year
$20,000
-
$
03: 2.7241 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT Savings:
$1,773
Cost:
$1,500
$1,468 16,679 $305 38 - - $1,468
16,679
kWh
$305
38
kW-months/year
-
-
$
04: 2.7272 INSTALL HEAT PIPES / RAISE COOLING SETPOINT Savings:
$427
Cost:
$114
$330 3,754 $97 12 - - $330
3,754
kWh
$97
12
kW-months/year
-
-
$
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$389
Cost:
$529
$339 3,849 $40 5 $10 - $339
3,849
kWh
$40
5
kW-months/year
$10
-
$
TOTAL RECOMMENDED Savings:
$102,161
Cost:
$30,949
$72,868 828,041 $9,283 1,156 $20,010 - $72,868
828,041
kWh
$9,283
1,156
kW-months/year
$20,010
-
$
TOTAL IMPLEMENTED Savings:
$22,589
Cost:
$2,343
$2,137 24,282 $442 55 $20,010 - $2,137
24,282
kWh
$442
55
kW-months/year
$20,010
-
$
Savings
Cost
$ kWh $ kW-months/year $ $
Electricity Usage Electricity Demand One-time Revenue or Avoided Cost Electricity Usage Electricity Demand One-time Revenue or Avoided Cost